SPIFAN MCPD/GE ERP New Member Book

SPIFAN Expert Review Panel (ERP) New Member Book1
AOAC Policy Documents2
AOAC Bylaws3
Policy on the Use of the Association Name...15
AntiTrust Policy19
Policy & Procedure on Volunteer Conflict of Interest23
Rosters25
SPIFAN Nutrients Roster25
SPIFAN Whey Protein Roster26
Expert Review Panel Policy & Procedures27
First to Final Action Guidance for AOAC ERP32
Expert Review Panel Orientation34
AOAC Expert Review Panel-Orientation36
1. Road to Final Action OMA Status48
2. PTM Overview for PTM-OMA Harmonized Process50
3. AOAC Method Approval Programs52
4. Qualifications for ERP Membership54
5. Experts and Methods56
6. ERP Chair Responsibilities58
7. ERP Chair Responsibilities60
8. ERP Member Vetting Process62
9. Candidate Method Assignments64
10. Candidate Method Reviews66
11. ERP Meetings70
12. Method Review Overview72
13. Consensus – First Action Adoption74
14. Consensus – First Action to Final Action76
15. Road to First Action OMA Status78
16. ERP Meetings – Review for First Action80
17. ERP Methods Review & Approval82
18. OMB Expectations for First Action84
19. Publication of First Action Methods86
20. ERP Meetings – Method Tracking88
21. Documentation Needed90
22. OMB Meeting for Review of ERP Recommendations92
23. Modifications to Official Methods94
24. Editorial Modifications96
25. Editorial Changes98
26. Minor Modifications100
27. Major Modifications102
28. Minor & Major Modifications104
29. Applicant Options106
30. Pathways for Minor & Major Modification108
31. Requirements for ERP Service112
32. Ethical Expectations of AOAC Expert Review Panel Members116
33. Ethical Expectations of Expert Review Panel Members (con’t)118
34. Roles and Responsibilities120
35. Questions122
36. AOAC First Action Method Updates124
37. AOAC Policies & Procedures126
38. OMA, Appendix GFurther data indicative of adequate method reproducibility (between laboratory) performance to be collected. Data may be collected via a collaborative study or by proficiency or other testing data of similar magnitude.128
39. OMA, Appendix GTwo years maximum transition time (additional year(s) if ERP determines a relevant collaborative study or proficiency or other data collection is in progress).130
40. OMA, Appendix G Method removed from Official First Action and OMA if no evidence of method use available at the end of the transition time.132
41. OMA, Appendix G Method removed from Official First Action and OMA if no data indicative of adequate method reproducibility is forthcoming as outlined above at the end of the transition time.134
42. OMA, Appendix G ERP to recommend Method to Official Final Action Status to the OMB.136
43. OMA, Appendix GFirst Action to Final Action Methods: Guidance for AOAC Expert Review Panels138
44. OMB Expectation Parameters140
45. AOAC Expert Review PanelsAn Orientation220
46. Orientation Sections38
47. AOAC Method Approval Programs216
48. AOAC Policies & Procedures42
49. Policies and Procedures for Adoption of Official Methods of Analysis44
50. Road to First Action OMA Status46
51. OMB Expectation Parameters142
52. OMB Expectation Parameters144
53. Documentation Needed146
54. ERP Meetings148
55. ERP Meetings150
56. ERP Recommendations/Decision152
57. General Expectations for ERPs154
58. Ethical Expectations of AOAC Expert Review Panel Members156
59. Ethical Expectations of Expert Review Panel Members (con’t)158
60. Questions160
61. AOAC Expert Review Panel Chairs162
62. Roles and Responsibilities164
63. ERP Chair Responsibilities166
64. ERP Chair Responsibilities168
65. AOAC Policies & Procedures170
66. Qualifications for ERP Membership172
67. ERP Member Vetting Process174
68. ERP Meetings176
69. ERP Meetings – Review for First Action178
70. ERP Meetings – Method Tracking180
71. ERP Methods Review & Approval182
72. OMA, Appendix G ERP to recommend Method to Official Final Action Status to the OMB.184
73. OMA, Appendix GFurther data indicative of adequate method reproducibility (between laboratory) performance to be collected. Data may be collected via a collaborative study or by proficiency or other testing data of similar magnitude.186
74. OMA, Appendix GTwo years maximum transition time (additional year(s) if ERP determines a relevant collaborative study or proficiency or other data collection is in progress).188
75. OMA, Appendix G Method removed from Official First Action and OMA if no evidence of method use available at the end of the transition time.190
76. OMA, Appendix G Method removed from Official First Action and OMA if no data indicative of adequate method reproducibility is forthcoming as outlined above at the end of the transition time.192
77. OMA, Appendix GFirst Action to Final Action Methods: Guidance for AOAC Expert Review Panels194
78. OMB Expectation Parameters196
79. OMB Expectation Parameters198
80. OMB Expectation Parameters200
81. Documentation Needed202
82. OMB Meeting for Review of ERP Recommendations204
83. General Expectations for ERPs206
84. General Expectations for ERP Chairs208
85. Ethical Expectations of AOAC Expert Review Panel Members210
86. Ethical Expectations of Expert Review Panel Members (con’t)212
87. Questions214
Appendices216
Appendix F: Guidelines for Standard Method Performance Requirements (SMPR)216
Annex220
Annex A220
Annex B225
Annex C227
Annex D228
Annex E230
Annex F231
Appendix G: Procedures & Guidelines for the Use of AOAC Voluntary Consensus Standards...234
Appendix L: AOAC Recommended Guidelines for SPIFAN SLV Validation237

Made with FlippingBook flipbook maker