Transmission And Substation Foundations - Technical Design Manual (TD06088E)
DESIGN EXAMPLES
Figure 7-15: Helicap Printout
As can be seen from the Helicap® model, 99 kip can be attained using an RS4500.337. L-pile/Hand Calc Method For this analysis, the cap is going to be considered fully rigid. The first step is to determine a pile configuration and spacing, then ensure the load to the piles is not greater than allowable. In this case, the wanted configuration includes 9 piles (all with 100 kip capacity) and located on a 3x3 grid. A sample pile layout can be seen in Figure 7-16.
Page 7-26 | Hubbell Power Systems, Inc. | All Rights Reserved | Copyright © 2017