DESIGN EXAMPLES
Figure 7-23: Guy Piles Helicap® Report
With these results, it is possible to calculate the required installation torques for the piles. For an 8” diameter pipe, the Kt is 4:1 and for SS150, Kt is 10:1. To calculate required torque, equation:
Equation 7-6
Installation Torque (ft-lbs)=required Capacity(kip)*1000/Kt
The required installation torque for the RS8625 piles is 25,000 ft-lbs and for the guy anchors is 6,000 ft-lbs.