ENTSOG GRIP South - ANNEX A: Infrastructure Projects
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry No entry
LNGTerminals France (PEG LNGTerminals France (PEG
Fos (Tonkin/Cavaou)
255,00 383,00
HubFrance (PEGSouth) HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
Inaddition to this specific connection, the reinforcementof the core transmission system is alsoneeded (ERIDAN, East Lyonnaispipeline,Bourgogneand/or compressionsdependingon thedevelopments already realized)
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 29
ENTSOG–GRIPSouth 2013–2022AnnexA
Made with FlippingBook