ENTSOG GRIP South - ANNEX A: Infrastructure Projects
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry Yes exit
HubFrance (PEGTIGF) HubFrance (PEGSouth)
PIRMIDI
230,00 80,00
HubFrance (PEGTIGF) HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
GRTgaz contribution to develop a newFR-ES IP on the Eastern axis -MidCat. In addition to these specific developments, the reinforcement of the core transmission system is also needed (ERIDAN, Arc Lyonnais pipeline, Val de Saône project and/or compressionsdependingon thedevelopments already realized)
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 35
ENTSOG–GRIPSouth 2013–2022AnnexA