ENTSOG GRIP South - ANNEX A: Infrastructure Projects

PROJECTEDCAPACITY INCREASES

InterconnecƟon

Capacity (GWh/d)

FromZone

ToZone

Modelled DirecƟon Yes exit Yes entry

Biriatou (FR) / Irun (ES)

60,00 00,00

HubFrance (PEGTIGF) HubSpain

HubFrance (PEGTIGF) HubSpain

DESCRIPTIONOFTHEPROJECT

It's a24 inches and95km longpipelinebetweenArcangues andCoudures thatwill allow to connect (using theexisƟng infrastructure) theUGSof Lussagnetwith theSpanish fronƟer.

COMMENTSABOUTTHEPROJECTFINANCING

PublicĮnancing

PrivateĮnancing

MulƟlateral Įnancing

| 48

ENTSOG–GRIPSouth 2013–2022AnnexA

Made with