ENTSOG GRIP South - ANNEX A: Infrastructure Projects

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry Yes exit

HubSpain HubFrance (PEGTIGF)

LePerthus

230,00 80,00

HubSpain HubFrance (PEGTIGF)

DESCRIPTIONOFTHEPROJECT

In theFrench side, it's composedby a120kmlongpipelinebetween the frontier (near LePerthus) and theCSof Barbaira, the installationof anaditional compressionof 10MWat Barbaira, anda28kmlongpipelinebetween Lupiac andBaran (ArtèreduGascogne).

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 50

ENTSOG–GRIPSouth 2013–2022AnnexA

Made with