ENTSOG GRIP South - ANNEX A: Infrastructure Projects

TRA-F-039

Iberian-French corridor:WesternAxis (CSChazelles)

FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ

WƵďůŝĐ&ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

'ZdŐĂnj ƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Regulated Regulated

2012

1

FID Construction Commissioning Last completedPhase :

2010Q1

No

2012 2013/1

+36,00

Not relevant

%Exemption inentrydirection %Exemption inexitdirection

0%

Permitting

0%

| 6

ENTSOG–GRIPSouth 2013–2022AnnexA