ENTSOG GRIP South - ANNEX A: Infrastructure Projects
TRA-F-039
Iberian-French corridor:WesternAxis (CSChazelles)
FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ
WƵďůŝĐ&ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
'ZdŐĂnj ƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Regulated Regulated
2012
1
FID Construction Commissioning Last completedPhase :
2010Q1
No
2012 2013/1
+36,00
Not relevant
%Exemption inentrydirection %Exemption inexitdirection
0%
Permitting
0%
| 6
ENTSOG–GRIPSouth 2013–2022AnnexA