ENTSOG GRIP South - ANNEX A: Infrastructure Projects

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes exit

HubPortugal

Badajoz (ES) /CampoMaior (PT)

35,00

HubSpain

DESCRIPTIONOFTHEPROJECT

The project consists of a Compressor Station in themain high pressure pipeline and it aims to increase the capacity of the pipeline section between Sines and Leiria, to enable that higher flow rates can be transported from the LNG Sines Terminal.

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 78

ENTSOG–GRIPSouth 2013–2022AnnexA