ENTSOG GRIP South - ANNEX A: Infrastructure Projects
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes exit Yes entry
StoragePortugal HubPortugal
UGS - PT - RENGasodutos/RENAmazenagem
42,90 11,90
StoragePortugal HubPortugal
DESCRIPTIONOFTHEPROJECT
CarriçoUGS isbasedon caverns leached ina saltdome. Surfaceplant includes the facilities for injectionandwithdrawal of natural gas from the caverns inoperation. Theexpansionof theCarriçoUGS infrastructure is amulti step /multi stage long termprojectmainlydue to the fact that theaverageconstruction timeof a salt cavern is about three years and there is a limitation to thenumber of caverns that canbedeveloped simultaneously (currently two). Presently there is onenewcavernunder construction (leaching phase) and another onewhichwill start filling inwith gas (cushion gas andoperating gas) in the 1st quarter of 2013. As for the ƌĞŵĂŝŶĚĞƌ ƐĂůƚ ĐĂǀĞƌŶƐ͕ ƚŚĞLJŵĂLJďĞ ƌĞŐĂƌĚĞĚĂƐƉůĂŶŶĞĚƐŝŶĐĞ ƚŚĞLJŚĂǀĞďĞĞŶ ŝŶƚĞŐƌĂƚĞĚ ŝŶ ƚŚĞĐŽŵƉĂŶŝĞƐ͛ ďƵƐŝŶĞƐƐƉůĂŶƐ͕ ƚŽŐĞƚŚĞƌǁŝƚŚ ƚŚĞ ůĂƚĞƌ ĐĂƉĂĐŝƚLJ ŝŶĐƌĞĂƐĞŽĨ ƚŚĞŐĂƐ ƐƚĂƚŝŽŶ͘
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
100% financing by RENArmazenagemand Transgás Armazenagemof their respective investments (two independent concessionaires)