ENTSOG GRIP South - ANNEX A: Infrastructure Projects
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry
HubFrance (PEGNorth)
Dunkerque LNG / FRn
250,00
HubFrance (PEGNorth)
DESCRIPTIONOFTHEPROJECT
The connectionof the terminal needs spécific transmission systemdevelopement and core systemdevelopements (ArcdeDierrey)
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 9
ENTSOG–GRIPSouth 2013–2022AnnexA
Made with FlippingBook