ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex A: Country-TSO Profiles

Bulgaria

W

(op

DO

Horezu

Constanţa TR

Mehedinti

ANA

BUCHAREST

LUCEAFARUL

53

NegruVoda

Silistra

WHITE STREAM (option 1)

Giurgiu

DO

Kardam

64

Ruse

Dobrich

aječar

IBR

South Stream

Varna

SOUTH STREAM

Kozloduy

Oryahovo Pleven

KAVARNA

š

GALATA

KALIAKRA

B U L G A R I A SOFIA

Dimitrovgrad

Burgas

ITB

124

Dupnitsa

Srtandszha Malkoclar

StaraZagora

52

Ihtiman

ilovo Kyustendil 50

Stream

South

Kirklareli

Edirne

Istanbul

IGB

Petrich

Kulata

51

Xanthi

Sidirokastron

Tekirdag

Drama

Marmara Ereglisi

Komotini

Kavala

222

Kilkis

Alexandroupoulis

Ki i

Existing Gas Infrastructure NUMBER OF TSOS

1

TOTAL LENGTH OF TRANSMISSION NETWORK(S)

2,645 km

TOTAL COMPRESSOR POWER Transmission: 263 MW Storage: 10 MW Inter-TSO connections where capacity is marketed (including upstream operators) BULGARTRANSGAZ

– Negru Voda 1 (Transgaz RO / Kardam (BG) – Negru Voda 2,3 (Transgaz RO) / Kardam (BG) – Kulata (BG) / Sidirokastron (DESFA GR) – Srtandzha (BG) / Malkoclar (BOTAŞ TR) – Kyustendil (BG) / Zidilovo (GA-MA MK)

LNG terminals

N / A

Storage facilities The underground gas storage facility, which is owned and operated by Bulgartransgaz is connected to Bulgartransgaz network Production facilities Production facilities in Bulgaria are connected to Bulgartransgaz network in the following entry points:

UGS Chiren

– GMS Provadia – GRS Pleven

Directly connected customers BULGARTRANSGAZ

– Total: 262 – Gas-fired power plants: 0 TSO connections to Distribution Systems and total number of DSOs in the country BULGARTRANSGAZ – Number of physical TS-DS connections: 65 – Number of DSOs: 17 PHYSICAL HUBS AND VIRTUAL TRADING POINTS N / A NUMBER OF BALANCING ZONES 1

4 | Southern Corridor GRIP 2014–2023 Annex A

Made with