ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Annex A: Country-TSO Profiles
Bulgaria
W
(op
DO
Horezu
Constanţa TR
Mehedinti
ANA
BUCHAREST
LUCEAFARUL
53
NegruVoda
Silistra
WHITE STREAM (option 1)
Giurgiu
DO
Kardam
64
Ruse
Dobrich
aječar
IBR
South Stream
Varna
SOUTH STREAM
Kozloduy
Oryahovo Pleven
KAVARNA
š
GALATA
KALIAKRA
B U L G A R I A SOFIA
Dimitrovgrad
Burgas
ITB
124
Dupnitsa
Srtandszha Malkoclar
StaraZagora
52
Ihtiman
ilovo Kyustendil 50
Stream
South
Kirklareli
Edirne
Istanbul
IGB
Petrich
Kulata
51
Xanthi
Sidirokastron
Tekirdag
Drama
Marmara Ereglisi
Komotini
Kavala
222
Kilkis
Alexandroupoulis
Ki i
Existing Gas Infrastructure NUMBER OF TSOS
1
TOTAL LENGTH OF TRANSMISSION NETWORK(S)
2,645 km
TOTAL COMPRESSOR POWER Transmission: 263 MW Storage: 10 MW Inter-TSO connections where capacity is marketed (including upstream operators) BULGARTRANSGAZ
– Negru Voda 1 (Transgaz RO / Kardam (BG) – Negru Voda 2,3 (Transgaz RO) / Kardam (BG) – Kulata (BG) / Sidirokastron (DESFA GR) – Srtandzha (BG) / Malkoclar (BOTAŞ TR) – Kyustendil (BG) / Zidilovo (GA-MA MK)
LNG terminals
N / A
Storage facilities The underground gas storage facility, which is owned and operated by Bulgartransgaz is connected to Bulgartransgaz network Production facilities Production facilities in Bulgaria are connected to Bulgartransgaz network in the following entry points:
UGS Chiren
– GMS Provadia – GRS Pleven
Directly connected customers BULGARTRANSGAZ
– Total: 262 – Gas-fired power plants: 0 TSO connections to Distribution Systems and total number of DSOs in the country BULGARTRANSGAZ – Number of physical TS-DS connections: 65 – Number of DSOs: 17 PHYSICAL HUBS AND VIRTUAL TRADING POINTS N / A NUMBER OF BALANCING ZONES 1
4 | Southern Corridor GRIP 2014–2023 Annex A