ENTSOG GRIP South - Main Report

Between Portugal and Spain Both existing cross-border interconnection points between Portugal and Spain are totally developed. There will be an increase of capacity in Campo Maior /Badajoz IP (PT–>ES) due to a core network development on the Portuguese system, Carregado Compressor Station. There is projected a n-FID development in order to create a new interconnectionbetweenPortugal andSpainby 2018.

Infrastructure

FlowDirection

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Valença doMinho (PT) /Tuy (SP)

SP>PT

30

30

30

30

30

30

30

30

30

30

1

PT>SP

25

25

25

25

25

25

25

25

25

25

Badajoz (SP) /CampoMaior (PT)

SP>PT

134 134 134 134 134 134 134 134 134 134

2

PT>SP

35

35

35

35

35

70

70

70

70

70

Mangualde (PT) /Zamora (ES) (3rd Spain /Portugal IP)

SP>PT

75

75 107 107 142

I

PT>SP

50

50

97

97 142

n-FID capacity at existing IP  

n-FID capacity at future IP development

Table 5.9: FID capacities between Portugal and Spain (GWh /d)

Between Spain and France Cross-border interconnectionpoint betweenSpainandFrancecreating theWestern Axis will increase its firm capacity thanks to the joint efforts of Enagás and TIGF in order toenhancea larger interconnectioncapacitybetweenSpanishandFrenchgas marketsat Larrau IPandBiriatou/Irun IP. Anew IP (LePerthus) on theeastern side of the border is projected by 2022 as n-FID capacity development (commonly known asMidCat Project)

Infrastructure

FlowDirection

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Biriatou (FR) / Irun (ES)

SP>FR (TIGF)

5

5

5

60

60

60

60

60

60

60

3

FR (TIGF)>SP

Larrau

SP>FR (TIGF)

100 165 165 165 165 165 165 165 165 165

4

FR (TIGF)>SP

100 165 165 165 165 165 165 165 165 165

Le Perthus

SP>FR (TIGF)

230

II

FR (TIGF)>SP

80

n-FID capacity at future IP development

Table 5.10: FID capacities between Spain and France (GWh /d)

48 |

ENTSOG–GRIPSouth 2013–2022

Made with