Between Portugal and Spain Both existing cross-border interconnection points between Portugal and Spain are totally developed. There will be an increase of capacity in Campo Maior /Badajoz IP (PT–>ES) due to a core network development on the Portuguese system, Carregado Compressor Station. There is projected a n-FID development in order to create a new interconnectionbetweenPortugal andSpainby 2018.
Infrastructure
FlowDirection
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Valença doMinho (PT) /Tuy (SP)
SP>PT
30
30
30
30
30
30
30
30
30
30
1
PT>SP
25
25
25
25
25
25
25
25
25
25
Badajoz (SP) /CampoMaior (PT)
SP>PT
134 134 134 134 134 134 134 134 134 134
2
PT>SP
35
35
35
35
35
70
70
70
70
70
Mangualde (PT) /Zamora (ES) (3rd Spain /Portugal IP)
SP>PT
75
75 107 107 142
I
PT>SP
50
50
97
97 142
n-FID capacity at existing IP
n-FID capacity at future IP development
Table 5.9: FID capacities between Portugal and Spain (GWh /d)
Between Spain and France Cross-border interconnectionpoint betweenSpainandFrancecreating theWestern Axis will increase its firm capacity thanks to the joint efforts of Enagás and TIGF in order toenhancea larger interconnectioncapacitybetweenSpanishandFrenchgas marketsat Larrau IPandBiriatou/Irun IP. Anew IP (LePerthus) on theeastern side of the border is projected by 2022 as n-FID capacity development (commonly known asMidCat Project)
Infrastructure
FlowDirection
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Biriatou (FR) / Irun (ES)
SP>FR (TIGF)
5
5
5
60
60
60
60
60
60
60
3
FR (TIGF)>SP
Larrau
SP>FR (TIGF)
100 165 165 165 165 165 165 165 165 165
4
FR (TIGF)>SP
100 165 165 165 165 165 165 165 165 165
Le Perthus
SP>FR (TIGF)
230
II
FR (TIGF)>SP
80
n-FID capacity at future IP development
Table 5.10: FID capacities between Spain and France (GWh /d)
48 |