ENTSOG GRIP South - Main Report

In France Thanks to the reinforcements at TIGF area, capacity at PIRMIDI have increased on both flow directions. The French National Regulatory Authority aims to create a single gas market in France. To achie ve this goal, GRTgaz South Hub and TIGF hub would first come closer. Amerger between France PEGNorth Hub and PEG SouthHub based on investments is also under study, with a cost benefits analysis.

Infrastructure

FlowDirection

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

PIRMIDI

FR (TIGF)>FR (GRTgaz South)

80 255 255 255 255 255 255 255 255 485

5

FR (GRTgaz South)>FR (TIGF)

325 395 395 395 395 395 395 395 395 475

Liaison Nord Sud

FR (GRTgaz South)>  FR (GRTgaz North) FR (GRTgaz North)>  FR (GRTgaz South)

6

230 230 230 230 230 230 merger merger merger merger

230 230 230 230 230 230 merger merger merger merger

n-FID capacity  

commercial merger

Table 5.11: FID capacities in France (GWh /d)

Import capacities There aren’t any expecteddevelopments of the importationpipelines.

Infrastructure

FlowDirection

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Tarifa

Algeria>SP

444 444 444 444 444 444 444 444 444 444

1

Almeria

Algeria>SP

266 266 266 266 266 266 266 266 266 266

2

Dunkerque

Norway>FR

585 585 585 585 585 585 585 585 585 585

3

Table 5.12: FID capacities Import with non-European third country (GWh /d)

LNGCapacities Anew LNGTerminal will be commissioned inDunkerque in2015, whereas capaci- ties at Fos, Sines andBilbaowill grow.

Infrastructure

FlowDirection

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Mugardos

Spain Hub

115

115

115

115

115

115

115

115

115

115

1

Bilbao

Spain Hub

223 223 223 223 223 223 223 223 223 223

2

Barcelona

Spain Hub

544 544 544 544 544 544 544 544 544 544

3

Sagunto

Spain Hub

279 279 279 279 279 279 279 279 279 279

4

Cartagena

Spain Hub

377 377 377 377 377 377 377 377 377 377

5

Huelva

Spain Hub

377 377 377 377 377 377 377 377 377 377

6

Sines

Portugal Hub

213 217 223 229 229 321 321 321 321 321

7

Montoir de Bretagne

France PEG>North Hub

370 370 370 370 370 370 425 425 425 425

8

Fos

France PEG>South Hub

410 410 410 450 450 450 450 785 1112 1112

9

Musel

Spain Hub

223

I

Dunkerque LNG

France Dunkerque cross border area

II

502 502 502 502 502 502 502

France PEG>North Hub

250 250 250 250 250 250 250

n-FID capacity at existing LNG Terminal

Table 5.13: FID capacities LNG (GWh /d)

ENTSOG–GRIPSouth 2013–2022 |

49