ENTSOG GRIP South - Main Report
IPwith other countries Capacities with Belgium at Taisnières will grow as a result of the Open Season conducted by GRTgaz and Fluxys in 2010 and 2011. A new IPwill be created from France toBelgium in 2016. There are plans to develop capacities with Switzerland and Italy (reverse flow and enhancement of exit capacities) and to develop a reverse flowwithGermany.
Infrastructure
FlowDirection
2013 2014 2015 2016 2017 2018 2019 2020 2021 2022
Medelsheim (DE) / Obergailbach (FR)
DE>FR
620 620 620 620 620 620 620 620 620 620
2 III
FR>DE
100 100 100 100
Oltingue (FR) / Rodersdorf (CH)
FR>CH
223 223 223 223 223 223 223 223 223 230
3 IV
CH>FR
100 100 100 100 100 100
Blarégnies (BE) / Taisnières (H) (FR)
BE>FR
570 640 640 640 640 640 640 640 640 640
1
BE>FR
230 230 230 230 230 230 230 230 230 230
New IP Alveringe (FR)– Maldegem (BE)
FR>BE
I
270 270 270 270 270 270 270
New IP France–Luxembourg FR>LU
40
40
40
40
V
n-FID capacity at existing IP
n-FID capacity at future IP development
Table 5.14: FID capacity (GWh /d) IPwith European country
UGS Developments of underground storages are decided inPortugal, Spain andFrance. Further developments are under consideration in France.
Capacity (GWh/d)
FlowDirection
2013 2014 2015 2016 2017 2018 2019 2020
France PEGNorth
FR (GRTgaz North) >UGS
847 847 847 847 847 847 847 847
UGS> FR (GRTgaz North)
1,465 1,465 1,465 1,465 1,465 1,465 1,465 1,465
France PEG South
FR (GRTgaz South) >UGS
311 311 385 394 394 394 394 394
UGS> FR (GRTgaz South)
1,149 1,149 1,441 1,476 1,476 1,476 1,476 1,604
France TIGF
FR (TIGF) >UGS
277 277 277 277 277 277 277 277
UGS> FR (TIGF)
454 454 454 454 454 454 454 454
Spain
SP>UGS
295 310 321 341 346 350 350 350
UGS> SP
400 576 602 625 640 649 660 671
Portugal
PT>UGS
24
24
36
36
36
36
36
36
UGS> PT
86
86 129 129 129 129 129 129
n-FID capacity
Table 5.15: FID capacity (GWh /d) in France
50 |
ENTSOG–GRIPSouth 2013–2022
Made with FlippingBook