ENTSOG GRIP South - Main Report

IPwith other countries Capacities with Belgium at Taisnières will grow as a result of the Open Season conducted by GRTgaz and Fluxys in 2010 and 2011. A new IPwill be created from France toBelgium in 2016. There are plans to develop capacities with Switzerland and Italy (reverse flow and enhancement of exit capacities) and to develop a reverse flowwithGermany.

Infrastructure

FlowDirection

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Medelsheim (DE) /  Obergailbach (FR)

DE>FR

620 620 620 620 620 620 620 620 620 620

2 III

FR>DE

100 100 100 100

Oltingue (FR) /  Rodersdorf (CH)

FR>CH

223 223 223 223 223 223 223 223 223 230

3 IV

CH>FR

100 100 100 100 100 100

Blarégnies (BE) /  Taisnières (H) (FR)

BE>FR

570 640 640 640 640 640 640 640 640 640

1

BE>FR

230 230 230 230 230 230 230 230 230 230

New IP Alveringe (FR)–  Maldegem (BE)

FR>BE

I

270 270 270 270 270 270 270

New IP France–Luxembourg FR>LU

40

40

40

40

V

n-FID capacity at existing IP  

n-FID capacity at future IP development

Table 5.14: FID capacity (GWh /d) IPwith European country

UGS Developments of underground storages are decided inPortugal, Spain andFrance. Further developments are under consideration in France.

Capacity (GWh/d)

FlowDirection

2013 2014 2015 2016 2017 2018 2019 2020

France PEGNorth

FR (GRTgaz North) >UGS

847 847 847 847 847 847 847 847

UGS> FR (GRTgaz North)

1,465 1,465 1,465 1,465 1,465 1,465 1,465 1,465

France PEG South

FR (GRTgaz South) >UGS

311 311 385 394 394 394 394 394

UGS> FR (GRTgaz South)

1,149 1,149 1,441 1,476 1,476 1,476 1,476 1,604

France TIGF

FR (TIGF) >UGS

277 277 277 277 277 277 277 277

UGS> FR (TIGF)

454 454 454 454 454 454 454 454

Spain

SP>UGS

295 310 321 341 346 350 350 350

UGS> SP

400 576 602 625 640 649 660 671

Portugal

PT>UGS

24

24

36

36

36

36

36

36

UGS> PT

86

86 129 129 129 129 129 129

n-FID capacity

Table 5.15: FID capacity (GWh /d) in France

50 |

ENTSOG–GRIPSouth 2013–2022

Made with