ENTSOG GRIP South - Main Report

6.6.2. CapacitySubscriptionat IPs betweenSpainand France

GWh/d

Biriatou/Irún IPcapacity subscription (2014–2022) \\ Spain – France flow direction According to the latest subscription information, booked capacity would reach to 75% from 2016 to 2022. \\ France – Spain flowdirection According to “Open Season for the development of new gas interconnection capacity between Spain and France as from 2015 (May 2010)”, firm capacity at French side for this IP is zero and at SpanishSide is 60GWh/d. There is no booked capacity at this flowdirection.

Capacity

70

60

50

40

30

20

10

0

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

Available

Portion reserved for short term Technical Capacity

Total Subscription

Figure 6.32: Biriatou IP Spain–France flow direction

Larrau IP capacity subscription (2014–2022) \\ France–Spain flow direction According to latest information, 89% of technical capacitywouldbebooked on long term basis until 2022. \\ Spain–France flow direction According to the latest subscription information, long-term booked capacity at this IP from Spain to France+flow direction would reach 70% from 2014 to 2022.

140 200 180 160 GWh/d

140 200 180 160 GWh/d

Capacity

Capacity

120 100

120 100

80 60 40 20

80 60 40 20

0

0

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

Available

Portion reserved for short term Technical Capacity

Available

Portion reserved for short term Technical Capacity

Total Subscription

Total Subscription

Figure 6.33: Larrau IP France–Spain flow direction

Figure 6.34: Larrau IP Spain–France flow direction

84 |

ENTSOG–GRIPSouth 2013–2022