ENTSOG GRIP South - Main Report

6.6.3. CapacitySubscriptionat IPswithin France

PIRMIDI IP capacity subscription (2014–2022) \\ TIGF–GRTgaz (PEG Sud) flow direction According to the latest subscription information, bookedcapacityat this IP from TIGF toGRTgaz flow directionwould reach75% from 2016 to 2022. \\ GRTgaz (PEG Sud)–TIGF flow direction According to the latest subscription information, bookedcapacityat this IP from GRTgaz to TIGF flowdirectionwouldhave an average utilization of 60%.

500 450 400 350 300 GWh/d

500 450 400 GWh/d

Capacity

Capacity

300 250 200 150 100 50 350

200 150 100 50 250

0

0

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

Available

Portion reserved for short term Technical Capacity

Available

Portion reserved for short term Technical Capacity

Total Subscription

Total Subscription

Figure 6.35: PIRMidi IP–TIGF–GRTgaz flow direction

Figure 6.36: PIRMidi IP-GRTgaz–TIGF flow direction

LiaisonNorth-South IP capacity subscription (2014–2022) Firm capacity for the North-South linked is restricted to 230GWh /d. Such a physical constraint accounts for the existence of two balancing zones. The current conditions lead to a high rate of subscription to the South link. Subscriptions are restricteduntil 2018by theCRE. Asaconsequence, long-term subscriptionsarenot possible. The terms and conditions for subscriptions from April 2014 are currently being discussed. This situation is a prime example of why capacity requirements to bebuilt between theNorth and theSouth zones. The subscription rate in the south- north direction is, however, very low.

GWh/d

GWh/d

Capacity

Capacity

350

350

300

300

250

250

200

200

150

150

100

100

50

50

0

0

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

Available

Portion reserved for short term Technical Capacity

Available

Portion reserved for short term Technical Capacity

Total Subscription

Total Subscription

Figure 6.37: GRTgaz (PEG South)–GRTgaz (PEGNorth) flow direction

Figure 6.38: GRTgaz (PEGNorth)–GRTgaz (PEG South) flow direction

ENTSOG–GRIPSouth 2013–2022 |

85

Made with