ENTSOG GRIP South - Main Report

1000 900 800 GWh/d

Capacity

Taisnieres IP capacity subscription (2014–2022) \\ Belgium-France (GRTgaz – PEGNord) flowdirection

0 600 500 400 300 200 100 700

According to the latest subscription information, there would be a high level of booked capacity at Taisnieres IP fromBelgium to France bothH-gas and L-gas.

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

Available

Portion reserved for short term Technical Capacity

Total Subscription

Figure 6.39: Taisnières H IP Belgium–France flow direction

1000 900 800 GWh/d

Capacity

Obergailbach IP capacity subscription (2014–2022) \\ Germany-France (GRTgaz–PEGNord) flow direction

0 600 500 400 300 200 100 700

According to the latest subscription information, booked capacity at this IPwouldhave an average utilization of 70% on long-termbasis.

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

Available

Portion reserved for short term Technical Capacity

Total Subscription

Figure 6.40: Obergailbach IP Germany–France flow direction

400 350 300 GWh/d

Capacity

Oltingue IP capacity subscription (2014–2022) \\ France (GRTgaz–PEGNord)–Switzerland/Italy flowdirection Technical capacity at Oltingue IP from France to Switzerland/Italy is actually total subscribed from 2014 to 2022.

200 150 100 50 250

0

1 Jan 2014

1 Jan 2015

1 Jan 2016

1 Jan 2017

1 Jan 2018

1 Jan 2019

1 Jan 2020

1 Jan 2021

1 Jan 2022

Available

Portion reserved for short term Technical Capacity

Total Subscription

Figure 6.41: Oltingue IP France–Switzerland/Italy flow direction

86 |

ENTSOG–GRIPSouth 2013–2022

Made with