ENTSOG GRIP South - Main Report
1000 900 800 GWh/d
Capacity
Taisnieres IP capacity subscription (2014–2022) \\ Belgium-France (GRTgaz – PEGNord) flowdirection
0 600 500 400 300 200 100 700
According to the latest subscription information, there would be a high level of booked capacity at Taisnieres IP fromBelgium to France bothH-gas and L-gas.
1 Jan 2014
1 Jan 2015
1 Jan 2016
1 Jan 2017
1 Jan 2018
1 Jan 2019
1 Jan 2020
1 Jan 2021
1 Jan 2022
Available
Portion reserved for short term Technical Capacity
Total Subscription
Figure 6.39: Taisnières H IP Belgium–France flow direction
1000 900 800 GWh/d
Capacity
Obergailbach IP capacity subscription (2014–2022) \\ Germany-France (GRTgaz–PEGNord) flow direction
0 600 500 400 300 200 100 700
According to the latest subscription information, booked capacity at this IPwouldhave an average utilization of 70% on long-termbasis.
1 Jan 2014
1 Jan 2015
1 Jan 2016
1 Jan 2017
1 Jan 2018
1 Jan 2019
1 Jan 2020
1 Jan 2021
1 Jan 2022
Available
Portion reserved for short term Technical Capacity
Total Subscription
Figure 6.40: Obergailbach IP Germany–France flow direction
400 350 300 GWh/d
Capacity
Oltingue IP capacity subscription (2014–2022) \\ France (GRTgaz–PEGNord)–Switzerland/Italy flowdirection Technical capacity at Oltingue IP from France to Switzerland/Italy is actually total subscribed from 2014 to 2022.
200 150 100 50 250
0
1 Jan 2014
1 Jan 2015
1 Jan 2016
1 Jan 2017
1 Jan 2018
1 Jan 2019
1 Jan 2020
1 Jan 2021
1 Jan 2022
Available
Portion reserved for short term Technical Capacity
Total Subscription
Figure 6.41: Oltingue IP France–Switzerland/Italy flow direction
86 |
ENTSOG–GRIPSouth 2013–2022
Made with FlippingBook