ENTSOG GRIP South - Main Report

\\ FID+n-FIDReinforcement of the Frenchnetwork from South toNorth –– the Bourgogne pipeline between Etrez and Voisines and the east Lyonnais pipeline between Saint-Avit andEtrez –– the Eridan pipeline and the Arc deDierry –– Reverse flow from France to Germany at Obergailbach/Medelsheim Interconnectionpoint \\ Interconnection point between Iberian Peninsula and France at Le Perthus – currently known asMidCat \\ 3rd interconnectionpoint betweenPortugal andSpain

Technical description of these projects:

TYNDP 2013–2022 Code Project  1)

Length (km)

Diameter (")

Compressor Power (MW)

Project Status

Commision­

Infrastructure

ing Date TSO /Country

3rd InterconnectionPointbetweenPortugalandSpain 1 PT– ES Interconnector Cantanhede Compressor Station TRA-N-284 12

n-FID

2019 Q4

REN Portugal

PT–ES Interconnector Pipeline Cantanhede–Mangualde PT–ES Interconnector Pipeline Spanish Border–Celorico

TRA-N-285

67

28

n-FID

2021 Q4

2

TRA-N-283

158

28

n-FID

2017 Q4

3

Interconnection ES–PT (3rd IP)

TRA-N-168

86

28

n-FID

2017 Q4 Enagás Spain 2018 Q4

4

CS Zamora power increase

TRA-N-159

23

n-FID

5

Table 7.1: 3rd Interconnection Point between Portugal and Spain

TYNDP 2013–2022 Code Project  1)

Length (km)

Diameter (")

Compressor Power (MW)

Project Status

Commision­

Infrastructure

ing Date TSO /Country

Iberian-FrenchCorridor: EasternAxis–MidCatProject 6 Iberian-French corridor: Eastern Axis–Midcat Project (CSMartorell) TRA-N-176 36

n-FID

2021

Enagás Spain

Iberian-French corridor: Eastern Axis–Midcat Project (Pipeline Figueras–French border) Iberian-French corridor: Eastern Axis–Midcat Project Pipeline Spanish Border–Barbaira+ CS Barbaira

TRA-N-161

25

36

n-FID

2021

7

TRA-N-252

120

32

10

n-FID

2021

8

TIGF France

Iberian-French corridor: Eastern Axis–Midcat Project Pipeline Lupiac–Barran

TRA-N-252

28

32

n-FID

2021

9

CSMonpellier

15 /20

GRTgaz France

10

TRA-N-256

n-FID

2021

CS Saint Martin de Crau

10

Table 7.2: Iberian-French corridor – Eastern Axis /MidCat Project

1) For further information about each project, see Annex A, “Ten Year Network Development Plan 2013–2022” Document

ENTSOG–GRIPSouth 2013–2022 |