ARP Supply Vol. 3

Heat Pump Stands, Furnace Blocks, Time Delays & Hard Starts

Electrolux & Frigidaire

HEAT PUMP STANDS

GE & Hotpoint

Whirlpool & Maytag

Cooking & Gas Products

MA-HP6

One-piece unit elevates heat pump and air handling units. Corrosion-resistant plastic construction. Features butyl mastic on top and bottom. Absorbs noise and vibration. Gray.

Dishwasher, Disposer & Water Heater

Order No.

Ht. In.

MA-HP3 MA-HP6

3 6

Laundry

HeatPumpStands,FurnaceBlocks,TimeDelays&HardStarts

FURNACE BLOCKS

Refrigeration

Measures 2-1/4” H x 5-1/2” L x 4” D.

Order No.

Desc.

Fittings, Venting & Installation

MA-68150

Furnace block

Electrical

TIME DELAYS

Features .03 to 10 minute adjustable time delay. Line voltage: 18 to 240V AC/DC. 50/60 Hz. Output: 1.5A max., 15A inrush.

Plumbing

Order No.

Desc.

MA-30301 MA-30303

Delay on make Delay on break

Property Maintenance

Motors

Unit#3380209

HARD STARTS

HVAC/R

Extra Boost For increasing starting torque on room, residential and commercial air condionting units and heat pumps. Features start capaci- tor and relay. Installs across run capacitor terminals. UL listed.

Order No.

Start Torque Oz.

Chemicals

MA-XP5 MA-XP6 MA-XP8

270 390 520

Charging, Recovery & Welding

Test Equip., Tools & Service Acc.

This information is provided “as is” without warranty of any kind by any person, including without limitation, the owner and the publisher.

313

Made with