INSTALLATION CHARGES NOT INCLUDED

(These items will be invoiced directly to restaurant by local FASC)

Filtered water line for ice machines at ABS and Self-serve This equipment is supplied by H+K. It is installed by the assigned soda system installer, and billed out at time and materials. This charge is added to the total soda system installation price. Have local soda system installer provide quote for equipment installation Ansul Charges Standard installation is paid for in the purchase of the hoods. This includes; connecting black iron piping for mechanical chase to hold, connecting wire rope, inserting fire link and arming system.

Additional Ansul Charges may consist of; Permit costs Fire Extinguishers Labor and materials to install remote Ansul pulls Labor and materials to perform dump test for Fire Marshall

Labor and materials to install horns and or strobe lights to fire suppression system. Labor and materials to drop out 3-phase electric power when Ansul system fires Labor and material to tie HVAC units to interlock (drop out make up air) Electrician Charges Most of the code requirements by the Fire Marshall require and electrician. The electrician will submit an additional bill for this work Code Charges Hood permits costs Inspections Requirement to butt weld duct, requires additional labor Requirement for additional duct clean outs over standard of (1) per change of direction Stainless steel panels applied to kitchen wall for fire rating (labor and material) Rebuilds and Relocations (additional charges) Additional charges arise from removal and transportation of existing equipment. Additional charges are comprised of travel time, equipment rental (lifts, trailers)

5.4

Made with FlippingBook flipbook maker