FY 2019-2023 Capital Improvement Plan

The proposed project consists of the mill and overlay of Woodland Ave and Fairway Street. 21-STR-001 2021 RECONSTRUCTION Both of these streets are in poor condition and are n need of an overlay to prolong the life expectancy.

Description: Justification: Budget Impact:

There will be minimal impact to the budget due to this project.

The proposed project will replace the control system for the city's traffic signals in the downtown area. This project twill include installation of new pole mounted controls for the 6 locations in downtown as well as new control systems at 8th Street and Grand and 4th Street SW and Grand. 21-STR-002 DOWNTOWN TRAFFIC LIGHT CONTROLLERS The current system is out of date and repairs are becoming more frequent and parts are becoming harder to find. It is time to up date this system to a more modern system. The proposed project would replace the frontage rod near the North "Y" area on Highway 71/18. The City took over ownership of this frontage road to aid in future development of the area. Per the agreement, the property owners are to pay for the removal of the exiting pavement prior to replacement. 21-STR-003 NORTH "Y" FRONTAGE ROAD The road has a fair amount of heavy truck traffic on it with Vander Haags and the storage building at the south end and is in poor condition and continues to degrade. Maintenance should be reduced on a new system. The proposed project would consist of a mill and overlay on 4th Street beginning at 5th Ave East and continuing west until the 900 block of W 4th Street. Resurfacing varies from 24' to 66' in width and the total length is 5,680 feet. 22-STR-001 4TH STREET HMA OVERLAY The overall condition of the road is in poor condition, however sections of this street have been replaced in the past few years with other construction projects. 4th Street is a major thoroughfare through the community and receives a high volume of traffic. Maintenance costs should decrease with a new surface on this section of road.

Description:

Justification:

Budget Impact:

Description:

Justification:

Budget Impact:

Description:

Justification:

Maintenance costs should decrease with a new surface on this street.

Budget Impact:

Made with FlippingBook - professional solution for displaying marketing and sales documents online