The UK Offshore Oil and Gas Fabricators Directory 2016

Capabilities and Capacities (continued) Cranage – Lifting Capacity and Hook Height (Tonnes and Metres)

Dockside and Jetty • Duchy crane – 25 tonnes, hook height 22.9 metres/12 tonnes, hook height 42.7 metres • No 2 dock east – 48 tonnes, hook height 28.9 metres/15 tonnes, hook height 47.5 metres • No 3 dock east – 12 tonnes, hook height 14 metres/3 tonnes, hook height 39 metres • No 2 dock west – 10 tonnes, 18.9 metres/3.75 tonnes, hook height 50 metres • 3-4 docks – 60 tonnes, hook height 18.9 metres/19 tonnes, hook height 50 metres • No 2 dock west – 45 tonnes, hook height 31 metres/30 tonnes, hook height 40 metres Mobile cranes • Iron fairy – 6 tonnes, hook height 2.4 metres • Demag AC100 – 100 tonnes, hook height 3 metres 12.5 metres jib/ 1.7 tonnes, hook height 46 metres 50.2 metres jib • Liebherr 150 Litronic – 40 tonnes, hook height 16 metres/ 13.7 tonnes, hook height 32 metres Workshops and overhead gantry • Engineering workshop – 1 x 40 tonnes, 1 x 15 tonnes, 2 x 10 tonnes • Fabrication/plumbers workshop – 3 x 8 tonnes

• Electricians shop – 1 x 10 tonnes • Cleaning shop – 1 x 3.2 tonnes • Maintenance garage – 1 x 2 tonnes, 1 x 3 tonnes • Paint shop – 1 x 3 tonnes

• Compressor house – 1 x 4 tonnes • Wharf load-out – 50 tonnes/m 2 • <70 tonnes/m 2 selected areas wharf

Load-Out Capacity (Tonnes)

Not provided

Minimum Water Depth (Metres) Maximum Water Depth (Metres)

0.8 metres above chart datum (CD)

5.4 metres above CD mean high water springs

page 16

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2016