The UK Offshore Oil and Gas Fabricators Directory 2016

Projects and Markets Prior Experience/Projects

Shell Gabon Design, engineering and construction of five single level modules and supervised installation at the onshore facility in Gabon, Africa. The modules included offices and mess facilities. CNR International Maintenance and Refurbishment Framework contract for several maintenance jobs throughout the last six years for CNR International. Several multidisciplinary works done on Ninian South, North and Central and Tiffany. Centrica Energy Maintenance and Refurbishment Framework contract for several maintenance jobs throughout the last four years for Centrica Energy. Several multidisciplinary works done on AP1, DP3 and DP4 platforms. Nexen Buzzard Additional Living Quarter Design, engineering and construction of a 60-man additional living quarter (ALQ). It was constructed as 18 separate modules fully commissioned and installed offshore to reduce the need for heavy lifting barges. Talisman Montrose Additional Living Quarter Design, engineering and construction of a 30-man ALQ, constructed as 16 mini modules each weighing a maximum of 200 tonnes to meet the lifting capacity of the platform’s crane. Everest Additional Living Quarter Design, engineering and construction of a 24-man ALQ. The project was completed from design to installation within 12 months.

page 50

THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2016

Made with