The UK Offshore Oil and Gas Fabricators Directory 2016

Projects and Markets

York Platform Client:

Centrica Resources Ltd

Contract:

Engineering, procurement, construction and installation (EPCI)

Completion Date: Structure: Weight Topside:

2012

Production platform

1,300 tonnes 1,450 tonnes

Jacket:

Piles:

1 x 59.9 tonnes, 1 x 62.4 tonnes, 3 x 169.4 tonnes, 3 x 169.6 tonnes and 1 x 218.1 tonnes

Size (Length x Width x Height) Topside:

20 x 15 x 16 metres 30 x 20 x 69 metres

Jacket:

Piles:

1 x 34.8 metres, 1 x 36.3 metres, 3 x 51.1 metres, 1 x 66.1 metres

Andrew Process Platform Client:

BP Exploration Operating Co. Ltd

Contract:

Fabrication contract

Completion Date: Structure: Weight Topside:

2012

Wellhead platform and jacket

750 tonnes Size (Length x Width x Height) Topside:

18 x 13 x 28 metres

>