The UK Offshore Oil and Gas Fabricators Directory 2016
Projects and Markets
York Platform Client:
Centrica Resources Ltd
Contract:
Engineering, procurement, construction and installation (EPCI)
Completion Date: Structure: Weight Topside:
2012
Production platform
1,300 tonnes 1,450 tonnes
Jacket:
Piles:
1 x 59.9 tonnes, 1 x 62.4 tonnes, 3 x 169.4 tonnes, 3 x 169.6 tonnes and 1 x 218.1 tonnes
Size (Length x Width x Height) Topside:
20 x 15 x 16 metres 30 x 20 x 69 metres
Jacket:
Piles:
1 x 34.8 metres, 1 x 36.3 metres, 3 x 51.1 metres, 1 x 66.1 metres
Andrew Process Platform Client:
BP Exploration Operating Co. Ltd
Contract:
Fabrication contract
Completion Date: Structure: Weight Topside:
2012
Wellhead platform and jacket
750 tonnes Size (Length x Width x Height) Topside:
18 x 13 x 28 metres
>
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2016
page 83