The UK Offshore Oil and Gas Fabricators Directory 2016
Projects and Markets (continued)
Ensign Platform Client:
Centrica Energy
Contract:
Engineering, procurement and construction (EPC)
Completion Date:
2011
Structure:
Wellhead platform and jacket
Weight Topside:
500 tonnes
Jacket: 500 tonnes Size (Length x Width x Height) Topside:
16 x 12 x 8.5 metres
Jacket:
20 x 20 x 48 metres
Buzzard Platform Client:
Nexen Petroleum UK Ltd
Contract:
Fabrication contract (topside and bridges)
Completion Date: 2010 Structure:
Production sweetening topsides and bridge (Heerema Hartlepool)
Weight Topside:
6,000 tonnes
Bridge: 500 tonnes Size (Length x Width x Height) Topside:
60 x 36 x 42 metres
Bridge:
50 metres
page 84
THE UK OFFSHORE OIL AND GAS FABRICATORS DIRECTORY 2016
Made with FlippingBook