The UK Offshore Oil and Gas Fabricators Directory 2016

Projects and Markets

Sheringham Shoal Substation Topsides Client: AREVA T&D Ltd Contract:

Engineering, procurement and construction (EPC)

Completion Date: 2010 Structure:

Two offshore wind substation topsides

Weight Topsides:

806 tonnes and 803 tonnes

Size (Length x Width x Height) Topside:

30.5 x 17.7 x 16 metres

Fabrication Tonnage (Last Three Years)

14,000 tonnes

Fabrication Revenue/Turnover (Last Three Years)

Not provided

Ability To Build Large Structures Under Cover (Yes/No)

Yes

Current Market Areas

Oil, gas and renewable energy-related industries

Potential Market Areas

Not provided

>