The UK Offshore Oil and Gas Fabricators Directory 2016

Capabilities and Capacities – Tyneside Total Area (m²) 325,000 m 2 Fabrication Area Covered (m²) 16,500 m 2 Assembly and Erection Area (m²) 104,000 m 2 Cranage – Lifting Capacity and Hook Height (Tonnes and Metres)

Internal Cranage Capability A Shop Bay 1 – 1 x 50 tonne Apollo, 12.8 metres A Shop Bay 2 – 3 x 40 tonne Morris, 12.8 metres A Shop Bay 3 – 1 x 25 tonne Morris, 9 metres 2 x 15 tonne Morris 3 x 25 tonne Street 1 x 20 tonne Street B Shop Bay 1 – 4 x 25 tonne Street, 9.9 metres B Shop Bay 2 – 6 x 25 tonne NEI, 9 metres B Shop Bay 3 – 1 x 50 tonne Demag, 11 metres B Shop Bay 4 – 1 x 5 tonne Street, 11 metres B Shop Bay 5 – 1 x Felco

B Shop Bay 6 B Shop Bay 7

Load-Out Capacity (Tonnes)

Up to 13,000 tonnes self-propelled modular transporter trailer load-out

Minimum Water Depth (Metres) Maximum Water Depth (Metres)

-5 metres lowest astronomical tide (LAT) at quay 1 -6.5 metres LAT at quay 2

11.5 metres (mean high water spring)

Dry-Dock Capability

Not applicable

Other e.g. Licences, Permissions, Warehouse and Storage Size, Engineering, Electrical and Joiners Workshop Size, etc.

• Quay wall – 1,000 metres • Warehousing and covered storage – 7,300 m 2 • Office area – 10,000 m 2 • Two fully equipped canteens • No fixed limit load-out capacity; structures up to 13,000 tonne have been loaded out • Maintenance dredging licence, LAT -7 metres • Main navigation channel of River Tyne at Hadrian Yard, LAT -6 metres