DECOMMISSIONING INSIGHT REPORT 2016
Figure 45: Historical Variation in the Removal Cost per Tonne Forecasts for Topsides and Substructures in the Southern North Sea and Irish Sea
Average Forecast Topside Removal Cost per Tonne Average Forecast Substructure Removal Cost per Tonne Average Forecast Topside and Substructure Removal Cost per Tonne Range in Cost Forecasts
0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000
Estimated Cost per Tonne (£ - 2015 Money)
2011
2012 2013 2014 2015 2016
2012 2013 2014 2015 2016
Topside and Substructure
Topside
Substructure
Source: Oil & Gas UK
Removal Cost per Tonne
2015 Survey Average
2016 Survey Average
Topsides
£4,600 £4,400
£2,600 £2,600
Substructures
66