FY 2020-2024 Capital Improvement Plan

The proposed project would purchase a new mosquito sprayer. The sprayer would be able to regulate pressure to compensate for changes in vehicle speed. 21-STEQ-003 MOSQUITO SPRAYER

Description:

A new sprayer would be more accurate delivering chemical.

Justification: Budget Impact:

The proposed project will replace a 1997 Elgin Mechanical Street Sweeper with a new unit. 22-STEQ-001 STREET SWEEPER REPLACEMENT The current sweeper will be 22 years old at time of replacement and will need to be replaced.

Description: Justification: Budget Impact:

Maintenance costs should be lower due to a new vehicle.

The proposed project will construct a new equipment storage building at the street division location. 23-STEQ-001 EQUIPMENT STORAGE

Description: Justification:

Currently some of the department's equipment is being stored in a concrete domed building. This structure was previously used as a trickling filter when the city's wastewater treatment plant was located on the site of the current street division. This building is not suitable for the storage of equipment due to moisture issues.

Budget Impact:

Made with FlippingBook - Online catalogs