Schedule of External User Fees for Year 14-15
Water and Sewer Connections 1 Size/Type
Fee 2
5/8” x 3/4” Water 3/4” x 3/4” Water
$1,100 $1,150
1” Water
Per Cost Per Cost Per Cost Per Cost Per Cost Per Cost Per Cost
1 1/2” Water
2” Water 3” Water 4” Water 6” Water 8” Water
5/8” x 3/4” Add On 3/4” x 3/4” Add On
$470 $510
1” Add On
Per Cost Per Cost Per Cost
1 1/2” Add On
2” Add On
Set 5/8”
$165 $185 $200 $235 $310 $385
Set 5/8” (New Construction)
Set 3/4”
Set 1”
Set 1 1/2”
Set 2” Set 3” Set 4” Set 6” Set 8”
Per Cost Per Cost Per Cost Per Cost
4” Sewer 6” Sewer 8” Sewer
$1,050
Per Cost Per Cost Per Cost Per Cost
8” x 4” Saddle 8” x 6” Saddle
Adjust Hydrant 10’ Hydrant to Main
Per Cost Per Cost
Inspections and Special Testing Test Type
Fee $50
Hydrant Flow Test Extra Service Trip
$60 per trip
Application and Cut-On Fee
$15
Special Meter Test at Customer’s Request
Fee $60 $60 $60 $90 $90
5/8” 3/4”
1”
1 1/4” 1 1/2”
2” 3”
$120 $150
1 Fees do not include the cost of pavement cuts which will be assessed at a rate of $575 per job (standard street); $250.00 additional fee for request to raise a sewer lateral in order to connect to a residential sewer line. 2 Deduct $100.00 off total proposed fee if water and sewer installed in same ditch.
City of Greensboro External User Fee Schedule FY 2013-2014