ENTSOG GRIP CEE 2014-2023 / Annex A : Country - TSO Profiles

Poland

56

Kaunas

Š akiai

R U S S I A Kaliningrad

Greifswald

Gdansk

Niechorze

Ś winouj ś cie

Kamminke

Płoty

Szczecin

OPAL

GIPL

P O L A N D

Tietier

214

215

Mallnow

Wloclawek

EuRoPoL

Kon

03

38

102

Gross Köris

101

Wysokoje

Lwòwek

EuRoPoL

Poznan

Rembelszczyzna

216

Guben

Gubin

WARSAW

Lodz

Lasów

Odolanów

Wronów

Jeleniów

39

417 VTP-GAZ-SYSTEM

Wroclaw

au

oraSvatéKate ř iny ndov

Tworze ń

Katowice

Kou ř im

AGUE

O ś wi ę cim

Jaroslaw

STORK II

Rzeszow

Cieszyn

PogórskaWola

Skoczów

44

Drozdwicze

217

STORK

C Z E C H R E P.

Drozdovychi

Kralice

Žilina

VeselínadLužnicí

Poprad

Hostim

D Bojanovice

Existing Gas Infrastructure NUMBER OF TSOs

1

TOTAL LENGTH OF TRANSMISSION NETWORK(S)

10,077 km – transmission network 680 km – Yamal-Europe pipeline (GAZ-SYSTEM S.A. fulfils the function of ISO)

TOTAL COMPRESSOR POWER 140.6 MW – transmission network 400 MW – Yamal-Europe pipeline Inter-TSO connections where capacity is marketed (incl. upstream operators) GAZ-SYSTEM S.A. – Lasów / Ontras (DE) – Cieszyn / NET4GAS (CZ) – Drozdowicze / Ukrtransgaz (UA)

– Wysokoje / Gazprom Bieltransgaz (BY) – Tietierówka / Gazprom Bieltransgaz (BY) – Kondratki / Gazprom Bieltransgaz (BY) – Mallnow / Gascade (DE) – Lwówek / GAZ-SYSTEM S.A. - ISO – Włocławek / GAZ-SYSTEM S.A. - ISO

LNG terminals

N / A

Storage facilities GAZ-SYSTEM S.A.

– Swarzów / PGNiG – Strachocina / PGNiG – Brze ō nica / PGNiG – Husów / PGNiG – Wierzchowice / PGNiG – Mogilno / PGNiG

– Daszewo (Low-Methane Gas) / PGNiG – Bonikowo (Low-Methane Gas) / PGNiG – Mikstat / DPV Service Sp. z o.o.

18 | GRIP Central Eastern Europe 2014–2023 Annex A

Made with