ENTSOG GRIP CEE 2014-2023 / Annex A : Country - TSO Profiles
Network Overview Slovenian gas transmission system is connected through 3 interconnection points to the Austrian, Italian and Croatian gas transmission system. There is no interconnection between Slovenia and Hungary yet. Regarding the importance of the gas infrastructure projects, from the viewpoint of the development of the national gas market, harmonization with international projects and safety updates, the system operator divides planned gas infrastructure into 4 groups: s 6JG ƂTUV ITQWR CTG RTKQTKV[ RTQLGEVU VJCV TGRTGUGPV VJG DCEMDQPG QH VJG 5NQXGPKCP VTCPUOKUUKQP U[UVGO and without which it would not be possible to connect larger industrial consumers or thermo-energetic objects. – The second group are projects for cross-border gas transmission, which are included in international RTQLGEVU HQT FKXGTUKƂGF UWRRN[ QH VJG 'WTQRGCP ICU OCTMGV HTQO FKHHGTGPV RTQFWEVKQP UQWTEGU KP 4WUUKC the Middle East and from LNG terminals. – The third and fourth group include new construction connecting the gas transmission system with new municipalities and other gas consumers, also including projects that are intended to locally increase the capacity of the transmission system and the security of supply.
Plinovodi d.o.o. WEBSITE
www.plinovodi.si /
CURRENT PUBLICATIONS
N / A
TOTAL LENGTH OF THE TRANSMISSION NETWORK (this excludes distribution)
1,094 km
TOTAL COMPRESSOR POWER
16 MW
TOTAL TRANSPORTED ENERGY (in gas)
19.390 TWh / year 2012
UNBUNDLING MODEL
ITO
GRIP Central Eastern Europe 2014–2023 Annex A | 25
Made with FlippingBook