ENTSOG GRIP South - Annex A: Infrastructure Projects

ENTSOG GRIP South - Annex A: Infrastructure Projects

GASREGIONAL INVESTMENTPLAN 2013–2022

ANNEXA: InfrastructureProjects GRIPSouth

1 FRANCE

| 2

ENTSOG–GRIPSouth 2013–2022AnnexA

1.1 FRANCE

GRTgaz pipelines, including compressionprojects

| 3

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-F-037

Entry capacity increase fromBelgium to France

FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

WƵďůŝĐ&ŝŶĂŶĐŝŶŐ ;ϭϬ͕ϬϬйͿ

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϵϬ͕ϬϬйͿ

&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2012

1

Regulated Regulated

FID Construction Commissioning Last completedPhase :

2010Q2

+51,00

No

2012 2013/4

+8,00

Not relevant

%Exemption inentrydirection %Exemption inexitdirection

0%

Permitting

0%

| 4

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry

HubBelgium

Blarégnies (BE) /Taisnières (H) (FR) (Segeo/Troll)

50,00

HubFrance (PEGNorth)

DESCRIPTIONOFTHEPROJECT

dƌĂŶƐŵŝƐƐŝŽŶƐLJƐƚĞŵƐĚĞǀĞůŽƉŵĞŶƚ;ƐͿ ŝŶ&Z ;ĂŶĚ Ϳ ƚŽ ŝŶĐƌĞĂƐĞĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶ&ZĂƚ dĂŝƐŶŝğƌĞƐ ;ĨƌŽŵϱϵϬ ƚŽϲϰϬ'tŚͬĚͿ ͲK^ ŝŶϮϬϬϵͬϮϬϭϬ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 5

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-F-039

Iberian-French corridor:WesternAxis (CSChazelles)

FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ

WƵďůŝĐ&ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

'ZdŐĂnj ƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Regulated Regulated

2012

1

FID Construction Commissioning Last completedPhase :

2010Q1

No

2012 2013/1

+36,00

Not relevant

%Exemption inentrydirection %Exemption inexitdirection

0%

Permitting

0%

| 6

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry Yes exit

HubFrance (PEGTIGF) HubFrance (PEGSouth)

PIRMIDI

175,00 70,00

HubFrance (PEGTIGF) HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

'ZdŐĂnj ĐŽŶƚƌŝďƵƚŝŽŶ ƚŽ ƚŚĞ ƚƌĂŶƐŵŝƐƐŝŽŶƐLJƐƚĞŵƐĚĞǀĞůŽƉŵĞŶƚƐ ƚŽĚĞǀĞůŽƉ&ZͲ ^ /WĂƚ >ĂƌƌĂƵĂŶĚ ŝƌŝĂƚŽƵ͕K^ ŝŶϮϬϬϵͬϮϬϭϬ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 7

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-F-038

Developments for theDunkerque LNGnew terminal

FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf

WebLink

Private Financing (100,00%)

Specific developments, GRTgaz (100%)

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2013

2

Regulated Regulated

FID Construction Commissioning Last completedPhase :

2011Q4

+142,00

No

2013 2015/4

Not relevant

%Exemption inentrydirection %Exemption inexitdirection

0%

FEED

0%

| 8

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry

HubFrance (PEGNorth)

Dunkerque LNG / FRn

250,00

HubFrance (PEGNorth)

DESCRIPTIONOFTHEPROJECT

The connectionof the terminal needs spécific transmission systemdevelopement and core systemdevelopements (ArcdeDierrey)

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 9

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-F-040

Reverse capacity from France toBelgium at Veurne

FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

&ƌĞŶĐŚƐĞĐƚŝŽŶ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2014

1

Regulated Regulated

FID Construction Commissioning Last completedPhase :

2012Q2

+26,00

No

2014 2015/4

Not relevant

%Exemption inentrydirection %Exemption inexitdirection

0%

FID

0%

| 10

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes exit

HubFrance (PEGNorth)

New IPFR-BE (FR) /Alveringem-Maldegem (BE)

270,00

HubBelgium (ZeebruggeBeach)

DESCRIPTIONOFTHEPROJECT

EĞǁ/WŶĞĂƌsĞƵƌŶĞďĞƚǁĞĞŶ'ZdŐĂnjĂŶĚ&ůƵdžLJƐǁŝƚŚĐĂƉĂĐŝƚLJ ĨƌŽŵ&Z ƚŽ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 11

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-F-036

Arc deDierrey

FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

WƵďůŝĐ&ŝŶĂŶĐŝŶŐ ;ϭϮ͕ϬϬйͿ

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϴϴ͕ϬϬйͿ

ŽƌĞƐLJƐƚĞŵ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2014

2

Regulated Regulated

FID Construction Commissioning Last completedPhase :

2011Q4

+308,00

Not relevant

2014 2016

Not relevant

%Exemption inentrydirection %Exemption inexitdirection

0%

FID

0%

| 12

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

InterconnecƟon

Capacity (GWh/d)

FromZone

ToZone

Modelled DirecƟon Yes entry Yes entry Yes exit Yes exit Yes exit

HubFrance (PEGSouth) HubFrance (PEGNorth) HubGermany (NCG) HubFrance (PEGNorth)

Dunkerque LNG / FRn LiaisonNordSud

HubFrance (PEGNorth) HubFrance (PEGNorth) HubFrance (PEGNorth) HubFrance (PEGNorth) HubFrance (PEGSouth)

OlƟngue (FR) /Rodersdorf (CH) Medelsheim (DE) /Obergailbach (FR)

HubSwitzerland

DESCRIPTIONOFTHEPROJECT

This core systemdevelopment isnecessary for several projects in theNorth (Dunkerque LNG terminal,Mergerof theNorthandSouth zones, Reverse capacityatObergailbach, capaciƟes increaseatOlƟngue)

COMMENTSABOUTTHEPROJECTFINANCING

PublicĮnancing

PrivateĮnancing

MulƟlateral Įnancing

| 13

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-F-041

Eridan

FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

PublicFinancing (15,00%)

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf

WebLink

PrivateFinancing (85,00%)

Core system developments, GRTgaz (100%)

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2015

1

Regulated Regulated

FID Construction Commissioning Last completedPhase :

2011

+220,00

Not relevant

2015 2017

Not relevant

%Exemption inentrydirection %Exemption inexitdirection

0%

FID

0%

| 14

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

LiaisonNordSud InterconnecƟon

Capacity (GWh/d)

FromZone

ToZone

Modelled DirecƟon Yes exit Yes entry Yes entry Yes entry Yes exit

HubFrance (PEGTIGF) HubFrance (PEGSouth) HubFrance (PEGSouth) HubFrance (PEGSouth) HubFrance (PEGNorth)

HubFrance (PEGSouth) LNGTerminals France (PEG HubFrance (PEGSouth) HubFrance (PEGNorth) HubFrance (PEGTIGF)

PIRMIDI Fos (Tonkin/Cavaou)

PIRMIDI

DESCRIPTIONOFTHEPROJECT

Thisdevelopmentof the core transmission system, SaintMarƟndeCrau - SaintAvitpipeline, isnecessary for entry/exit capacity increases in theSouth zoneand tomerge theNorthanSouth zones.

COMMENTSABOUTTHEPROJECTFINANCING

PublicĮnancing

PrivateĮnancing

MulƟlateral Įnancing

EEPR

| 15

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-045

Reverse capacity fromCH to FR at Oltingue

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ͲͲ /ŶĨƌĂƐƚƌƵĐƚƵƌĞ WƌŽũĞĐƚƐ ;ϭϬϬйͿ

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Regulated Regulated

1

FID Construction Commissioning Last completedPhase :

Not relevant

Not relevant

2017

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 16

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction

DESCRIPTIONOFTHEPROJECT

ĞǀĞůŽƉĞŵĞŶƚƐŶĞĞĚĞĚ ƚŽĐƌĞĂƚĞ ƚŚŝƐ ƌĞǀĞƌƐĞĐĂƉĂĐŝƚLJ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 17

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-042

New interconnection IT-FR to connect Corsica

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf

WebLink

Undefined (100,00%)

French section, GRTgaz (100%)

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2 +320,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

Not relevant

Not relevant

2018

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 18

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction No entry

Hub Italia (Sardinia)

Porto-Vecchio

20,00

HubFrance (Corsica)

DESCRIPTIONOFTHEPROJECT

Thisproject is linked to theGALSI project and includes anoffshorepipeline fromSardinia toCorsicaandonshorepipelines inCorsica

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

Expected

| 19

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-043

Val de Saône project

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf

WebLink

Private Financing (100,00%)

Core system developments, GRTgaz (100%)

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

1 +190,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

Not relevant

+9,00

Not relevant

2018

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 20

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

LiaisonNordSud Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry Yes exit

HubFrance (PEGNorth) HubFrance (PEGSouth)

999,00 999,00

HubFrance (PEGNorth) HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

This reinforcement of the French Network consists in the looping of the Bourgogne pipeline (between Etrez and Voisines). In addition to the projetcs Arc de Dierrey in the North and ERIDAN in the South, this project is needed tomerge GRTgaz'sNorthandSouthmarket zones.

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 21

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-044

New interconnection to Luxembourg

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

ǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĞŶͬŚŽŵĞͬŵĂũŽƌͲƉƌŽũĞĐƚƐͬƉůĂŶͲ ĚĞĐĞŶŶĂůͬϭϬͲLJĞĂƌͲĚĞǀĞůŽƉŵĞŶƚͬ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2 +71,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

No

Not relevant

2018

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 22

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes exit Yes exit

HubFrance (PEGNorth) HubFrance (PEGNorth)

New IPFrance/Luxemburg

9,00 40,00

Hub Luxemburg Hub Luxemburg

DESCRIPTIONOFTHEPROJECT

EĞǁŝŶƚĞƌĐŽŶŶĞĐƚŝŽŶ ĨŽƌ ĂĚĚŝƚŝŽŶĂů ĨŝƌŵĞŶƚƌLJ ĐĂƉĂĐŝƚŝLJ ĨƌŽŵ&ƌĂŶĐĞ ƚŽ>ƵdžĞŵďŽƵƌŐ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 23

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-048

Developments forMontoir LNG terminal expansion at 12,5bcm - 1

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

1 +63,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

Not relevant

+10,00

Not relevant

2018

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 24

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry

LNGTerminals France (PEG

MontoirdeBretagne

55,00

HubFrance (PEGNorth)

DESCRIPTIONOFTHEPROJECT

dŚŝƐĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶĐƌĞĂƐĞĂƚDŽŶƚŽŝƌŽŶůLJŶĞĞĚƐ ƐƉĞĐŝĨŝĐĚĞǀĞůŽƉŵĞŶƚƐ͘

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 25

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-253

Est Lyonnais pipeline

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

ŽƌĞƐLJƐƚĞŵ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

3 +170,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

2015

No

Not relevant

2019

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 26

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry

LNGTerminals France (PEG

Fos (Tonkin/Cavaou)

HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

dŚŝƐĚĞǀĞůŽƉŵĞŶƚŽĨ ƚŚĞĐŽƌĞ ƚƌĂŶƐŵŝƐŝŽŶƐLJƐƚĞŵŝƐŶĞĐĞƐƐĂƌLJ ƚŽĚĞǀĞůŽƉĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶ ƚŚĞ^ŽƵƚŚ ;&ŽƐWƌŽũĞĐƚƐ͕ /WǁŝƚŚƐƉĂŝŶ͕ ƐƚŽƌĂŐĞƐͿ ĂŶĚĐŽŶƚƌŝďƵƚĞ ƚŽ ƚŚĞ^ŽƵƚŚͲEŽƌƚŚĐŽƌƌŝĚŽƌ ŝŶtĞƐƚĞƌŶ ƵƌŽƉĞ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 27

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-254

Developments for the Fos faster LNGnew terminal

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf

WebLink

Private Financing (100,00%)

Specific developments, GRTgaz (100%)

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

1 +30,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

2015

No

Not relevant

2019

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 28

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry No entry

LNGTerminals France (PEG LNGTerminals France (PEG

Fos (Tonkin/Cavaou)

255,00 383,00

HubFrance (PEGSouth) HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

Inaddition to this specific connection, the reinforcementof the core transmission system is alsoneeded (ERIDAN, East Lyonnaispipeline,Bourgogneand/or compressionsdependingon thedevelopments already realized)

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 29

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-255

Fos Tonkin LNG expansion

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E no

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Regulated Regulated

1

FID Construction Commissioning Last completedPhase :

No

Not relevant

2019

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 30

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry

LNGTerminals France (PEG

Fos (Tonkin/Cavaou)

80,00

HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

KŶůLJ ĐŽƌĞƐLJƐƚĞŵĚĞǀĞůŽƉŵĞŶƚƐ ĂƌĞŶĞĞĚĞĚ ĨŽƌ ƚŚŝƐĞdžƉĂŶƐŝŽŶ ͗ ƚŚĞLJǁŝůů ĚĞƉĞŶĚŽŶ ƚŚĞŽƚŚĞƌ ĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶĐƌĞĂƐĞƐ ŝŶ ƚŚĞ^ŽƵƚŚnjŽŶĞ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 31

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-047

Reverse capacity from France toGermany at Obergailbach

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

1 +60,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

No

+42,00

Not relevant

2020

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 32

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction No exit Yes exit No exit

HubFrance (PEGNorth) HubFrance (PEGNorth) HubFrance (PEGNorth)

Medelsheim (DE) /Obergailbach (FR)

180,00 100,00 250,00

HubGermany (NCG) HubGermany (NCG) HubGermany (NCG)

DESCRIPTIONOFTHEPROJECT

dŚŝƐƉƌŽũĞĐƚ ŝŶĐůƵĚĞƐƉŝƉĞůŝŶĞƐ ;ŝŶĐůƵĚŝŶŐĐŽŵƉƌĞƐƐŝŽŶͿ ĂŶĚĐŚĂŶŐĞƐ ŝŶ ƚŚĞŽĚŽƌŝƐĂƚŝŽŶƐLJƐƚĞŵ;ƌĞƉůĂĐŝŶŐŽĚŽƌŝƐƚĂŝŽŶƐƚĂƚŝŽŶƐ Ăƚ ƚŚĞĞŶƚƌLJŽĨ ƚŚĞ ƚƌĂŶƐŵŝƐƐŝŽŶƐLJƐƚĞŵďLJŽĚŽƌŝƐĂƚŝŽŶƐƚĂƚŝŽŶƐ Ăƚ ƚŚĞĞŶƚƌLJŽĨ ƚŚĞ ƌĞŐŝŽŶĂů ŶĞƚǁŽƌŬƐͿ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 33

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-256

Iberian-French corridor: EasternAxis-Midcat Project (CSMontpellier andCSSaintMartindeCrau)

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E yes

InterestedbyPCI ? IGAs

None

http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf

WebLink

Private Financing (100,00%)

GRTgaz section - Specific developments, GRTgaz (100%)

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Regulated Regulated

1

FID Construction Commissioning Last completedPhase :

No

+30,00

Not relevant

2021

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 34

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry Yes exit

HubFrance (PEGTIGF) HubFrance (PEGSouth)

PIRMIDI

230,00 80,00

HubFrance (PEGTIGF) HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

GRTgaz contribution to develop a newFR-ES IP on the Eastern axis -MidCat. In addition to these specific developments, the reinforcement of the core transmission system is also needed (ERIDAN, Arc Lyonnais pipeline, Val de Saône project and/or compressionsdependingon thedevelopments already realized)

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 35

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-269

Fosmax (Cavaou) LNG expansion

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E no

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Regulated Regulated

1

FID Construction Commissioning Last completedPhase :

No

Not relevant

2020

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 36

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry

LNGTerminals France (PEG

Fos (Tonkin/Cavaou)

327,00

HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

KŶůLJ ĐŽƌĞƐLJƐƚĞŵĚĞǀĞůŽƉŵĞŶƚƐ ĂƌĞŶĞĞĚĞĚ ĨŽƌ ƚŚŝƐĞdžƉĂŶƐŝŽŶ ͗ ƚŚĞLJǁŝůů ĚĞƉĞŶĚŽŶ ƚŚĞŽƚŚĞƌ ĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶĐƌĞĂƐĞƐ ŝŶ ƚŚĞ^ŽƵƚŚnjŽŶĞ͘

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 37

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-257

New lineBetweenChemery andDierrey

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

ŽƌĞƐLJƐƚĞŵ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

1 +210,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

Not relevant

Not relevant

2021

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 38

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry

LNGTerminals France (PEG

MontoirdeBretagne

HubFrance (PEGNorth)

DESCRIPTIONOFTHEPROJECT

dŚŝƐ ĐŽƌĞƐLJƐƚĞŵĚĞǀĞůŽƉŵĞŶƚĚĞǀĞůŽƉtĞƐƚͲ ĂƐƚ ĐĂƉĂĐŝƚLJ ƚƌĂŶƐŝƚ ŶĞĐĞƐƐĂƌLJ ĨŽƌDŽŶƚŽŝƌ >E'ƚĞƌŵŝŶĂů ĞdžƉĂŶƐŝŽŶϮĂŶĚ ĨŝƌŵƌĞǀĞƌƐĞ ĨůŽǁƚŽ'ĞƌŵĂŶLJ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 39

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-258

Developments forMontoir LNG terminal expansion at 16,5bcm - 2

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

1 +200,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

Not relevant

Not relevant

2021

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 40

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry

LNGTerminals France (PEG

MontoirdeBretagne

125,00

HubFrance (PEGNorth)

DESCRIPTIONOFTHEPROJECT

dŚŝƐĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶĐƌĞĂƐĞĂƚDŽŶƚŽŝƌ ŶĞĞĚƐ ƐƉĞĐŝĨŝĐĚĞǀĞůŽƉŵĞŶƚƐ ĂŶĚĐŽƌĞ ƐLJƐƚĞŵĚĞǀĞůŽƉŵĞŶƚƐ ;EĞǁůŝŶĞďĞƚǁĞĞŶ ŚĞŵĞƌLJĂŶĚ ŝĞƌƌĞLJͿ͘

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 41

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-046

Exit capacity increase toCH at Oltingue

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

GRTgaz GRTgaz

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ

WebLink

WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ

&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Regulated Regulated

3

FID Construction Commissioning Last completedPhase :

No

+30,00

Not relevant

2022

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

| 42

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes exit No exit

HubFrance (PEGNorth) HubFrance (PEGNorth)

Oltingue (FR) /Rodersdorf (CH)

100,00 40,00

HubSwitzerland HubSwitzerland

DESCRIPTIONOFTHEPROJECT

^ƉĞĐŝĨŝĐ ƚƌĂŶƐŵŝƐƐŝŽŶƐLJƐƚĞŵĚĞǀĞůƉĞŵĞŶƚƐ ƚŽ ŝŶĐƌĞĂƐĞĞdžŝƚ ĐĂƉĂĐŝƚLJ ƚŽ ,;ĚĞƐŝŐŶ ƚŽĐŽŶĨŝƌŵĂĐĐŽƌĚŝŶŐ ƚŽ ƚŚĞŵĂƌŬĞƚĚĞŵĂŶĚͿ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 43

ENTSOG–GRIPSouth 2013–2022AnnexA

1.2 FRANCE

TIGFpipelines, including compressionprojects

| 44

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-F-250

Girland - Artère deGuyennePhaseB

FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

TIGF TIGF

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

WebLink

ǁǁǁ͘ƚŝŐĨ͘Ĩƌ

hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ

d/'& ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2012Q3

1

Regulated Regulated

FID Construction Commissioning Last completedPhase :

2010Q1

+58,00

No

2012Q4 2013/3

+5,50

No

%Exemption inentrydirection %Exemption inexitdirection

0%

0%

| 45

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

InterconnecƟon

Capacity (GWh/d)

FromZone

ToZone

Modelled DirecƟon No exit No entry Yes entry Yes exit

HubFrance (PEGTIGF) HubFrance (PEGTIGF) HubFrance (PEGSouth) HubFrance (PEGSouth)

PIRMIDI

175,00 180,00 185,00 70,00

HubFrance (PEGTIGF) HubFrance (PEGTIGF) HubFrance (PEGSouth) HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

It's aDN900and58km longpipeline that conects theUGSof LussagnetwithCapƟeuxwithanaddiƟonal compressionat Sauveterre (thathasbeendecided in June)

COMMENTSABOUTTHEPROJECTFINANCING

PublicĮnancing

PrivateĮnancing

MulƟlateral Įnancing

| 46

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-F-251

Artère de l'Adour (former Euskadour) (FR-ES interconnection)

FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

TIGF TIGF

Notpartof TEN-E No

InterestedbyPCI ? IGAs

None

WebLink

www.artere-adour-tigf.fr

Undefined (100,00%)

Arcangues-Coudures, TIGF (100%)

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2014Q1

1

Regulated Regulated

FID Construction Commissioning Last completedPhase :

2012Q1

+95,00

No

2014Q3 2015/4

Not relevant

%Exemption inentrydirection %Exemption inexitdirection

0%

FEED

0%

| 47

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

InterconnecƟon

Capacity (GWh/d)

FromZone

ToZone

Modelled DirecƟon Yes exit Yes entry

Biriatou (FR) / Irun (ES)

60,00 00,00

HubFrance (PEGTIGF) HubSpain

HubFrance (PEGTIGF) HubSpain

DESCRIPTIONOFTHEPROJECT

It's a24 inches and95km longpipelinebetweenArcangues andCoudures thatwill allow to connect (using theexisƟng infrastructure) theUGSof Lussagnetwith theSpanish fronƟer.

COMMENTSABOUTTHEPROJECTFINANCING

PublicĮnancing

PrivateĮnancing

MulƟlateral Įnancing

| 48

ENTSOG–GRIPSouth 2013–2022AnnexA

TRA-N-252

Iberian-French corridor: EasternAxis-Midcat Project

Non-FID

Pipeline includingCS

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

TIGF TIGF

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

WebLink

www.tigf.fr

Undefined (100,00%)

TIGF (100%)

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

2 +148,00

Regulated Regulated

FID Construction Commissioning Last completedPhase :

No

+10,00

No

2021

%Exemption inentrydirection %Exemption inexitdirection

0%

0%

| 49

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes entry Yes exit

HubSpain HubFrance (PEGTIGF)

LePerthus

230,00 80,00

HubSpain HubFrance (PEGTIGF)

DESCRIPTIONOFTHEPROJECT

In theFrench side, it's composedby a120kmlongpipelinebetween the frontier (near LePerthus) and theCSof Barbaira, the installationof anaditional compressionof 10MWat Barbaira, anda28kmlongpipelinebetween Lupiac andBaran (ArtèreduGascogne).

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 50

ENTSOG–GRIPSouth 2013–2022AnnexA

FRANCE EdFLNG terminal projects

| 51

ENTSOG–GRIPSouth 2013–2022AnnexA

/1* )

'XQNHUTXH /1*7HUPLQDO

),'

LNGTerminal

SPONSORS

GENERAL INFORMATION

FINANCING

TOTAL (10%)

Promoter Operator TEN-EProject ?

Notpartof TEN-E Notdefinedyet EdF Dunkerque LNG

FLUXYS (25%)

InterestedbyPCI ? IGAs

None

WebLink

Private Financing (100,00%)

EDF (65%)

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)

Negotiated (e.g. Exemption) Negotiated (e.g. Exemption)

2010Q2

Dunkerque LNG

FID Construction Commissioning Last completedPhase :

2011Q2

+13,00

Yes

2011Q3 2015/4

+570.000,00 +45,60 267.000,00

Yes

Ship size (m3) Reloadingability?

%Exemption inentrydirection %Exemption inexitdirection

100%

FID

100%

Yes

| 52

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

InterconnecƟon

Capacity (GWh/d)

FromZone

ToZone

Modelled DirecƟon Yes exit Yes exit Yes exit

519,00 501,60 270,00

HubFrance (PEGNorth) LNGTerminals France (PEG

HubFrance (PEGNorth) (Dunkerque) HubFrance (PEGNorth)

Dunkerque LNG / FRn Dunkerque LNG Dunkerque LNG /Avringem - BE

DESCRIPTIONOFTHEPROJECT

LNG regasiĮcaƟonFacility located inDunkirk

COMMENTSABOUTTHEPROJECTFINANCING

PublicĮnancing

PrivateĮnancing

MulƟlateral Įnancing

| 53

ENTSOG–GRIPSouth 2013–2022AnnexA

1.4 FRANCE

ElengyLNG terminal projects

| 54

ENTSOG–GRIPSouth 2013–2022AnnexA

/1* 1

0RQWRLU /1*7HUPLQDO ([SDQVLRQ

1RQ ),'

LNGTerminal

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

Elengy Elengy

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

WebLink

ǁǁǁ͘ĞůĞŶŐLJ͘ĐŽŵͬĞŶͬƉƌŽũĞĐƚƐͬŵŽŶƚŽŝƌͲĞdžƚĞŶƐŝŽŶ͘Śƚŵů

hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ

ůĞŶŐLJ ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)

Regulated Regulated

2016Q1

Montoir LNGTerminal

FID Construction Commissioning Last completedPhase :

2016Q1

+6,50

No

2016Q2 2019/4

+190.000,00 +20,00 265.000,00

Not relevant

Ship size (m3) Reloadingability?

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

Yes

| 55

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes exit

LNGTerminals France (PEG

MontoirdeBretagne

220,00

HubFrance (PEGNorth)

DESCRIPTIONOFTHEPROJECT

dŚĞƉƌŽũĞĐƚ ĂŝŵƐ ƚŽĞdžƉĂŶĚ ƚŚĞ>E'ƚĞƌŵŝŶĂů ĐĂƉĂĐŝƚLJ ĨƌŽŵϭϬ ƚŽϭϲ͘ϱďĐŵͬLJ ƚŚƌŽƵŐŚ ƚŚĞĐŽŶƐƚƌƵĐƚŝŽŶŽĨ ƌĞŐĂƐŝĨŝĐĂƚŝŽŶƵŶŝƚƐ ĂŶĚƐƚŽƌĂŐĞ ƚĂŶŬƐ͘

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 56

ENTSOG–GRIPSouth 2013–2022AnnexA

/1* 1

)RV 7RQNLQ /1*7HUPLQDO ([SDQVLRQ

1RQ ),'

LNGTerminal

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

Elengy Elengy

Projectof Common Interest No

InterestedbyPCI ? IGAs

None

ǁǁǁ͘ĞůĞŶŐLJ͘ĐŽŵͬĞŶͬƉƌŽũĞĐƚƐͬĨŽƐͲƚŽŶŬŝŶͲŽƉĞŶͲ ƐĞĂƐŽŶ͘Śƚŵů

WebLink

d EͲ ZĞƋƵĞƐƚƐ

ĂƚĞŽĨ ZĞƋƵĞƐƚ

zĞĂƌ &ƵŶĚŝŶŐ'ƌĂŶƚĞĚ

Ϯϴ͘ϬϮ͘ϮϬϭϭ

EŽƚ LJĞƚ

hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ

ůĞŶŐLJ ;ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)

Regulated Regulated

2015Q3

FosTonkin LNGTerminal

FID Construction Commissioning Last completedPhase :

2015Q3

+2,50

No

2016Q2 2019/4

+80.000,00 +7,60 75.000,00

Not relevant

Ship size (m3) Reloadingability?

%Exemption inentrydirection %Exemption inexitdirection

0%

Market test

0%

Yes

| 57

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes exit

LNGTerminals France (PEG

Fos Tonkin

132,00

HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

dŚĞƉƌŽũĞĐƚ ĂŝŵƐ ƚŽƉƌŽůŽŶŐ ƚŚĞŽƉĞƌĂƚŝŽŶŽĨ ƚŚĞ>E'ƚĞƌŵŝŶĂů ƚŝůů ϮϬϯϱĂŶĚ ƚŽĞdžƉĂŶĚ ŝƚƐ ĐĂƉĂĐŝƚLJ ƚŽϱ͘ϱďĐŵͬLJ ƚŚƌŽƵŐŚ ŝŶƉĂƌƚŝĐƵůĂƌ ƚŚĞĐŽŶƐƚƌƵĐƚŝŽŶŽĨ ĂŶĞǁ>E'ƐƚŽƌĂŐĞ ƚĂŶŬ͘

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 58

ENTSOG–GRIPSouth 2013–2022AnnexA

/1* 1

)RV &DYDRX /1*7HUPLQDO ([SDQVLRQ

1RQ ),'

LNGTerminal

SPONSORS

GENERAL INFORMATION

FINANCING

Promoter Operator TEN-EProject ?

Elengy Fosmax LNG

Notpartof TEN-E Yes

InterestedbyPCI ? IGAs

None

ŚƚƚƉ͗ͬͬǁǁǁ͘ĨŽƐŵĂdžͲůŶŐ͘ĐŽŵͬĞŶͬǁŚŽͲĂƌĞͲǁĞͬƉƌŽũĞƚͲĚĞͲ ĚĞǀĞůŽƉƉĞŵĞŶƚ͘Śƚŵů

WebLink

d EͲ ZĞƋƵĞƐƚƐ

ĂƚĞŽĨ ZĞƋƵĞƐƚ

zĞĂƌ &ƵŶĚŝŶŐ'ƌĂŶƚĞĚ

ϮϬ͘ϬϮ͘ϮϬϭϯ

EŽƚ LJĞƚ

hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ

&ŽƐŵĂdž >E';ϭϬϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)

Regulated Regulated

2016Q2

FosCavaou LNGTerminal

FID Construction Commissioning Last completedPhase :

2016Q2

+8,25

No

2016Q2 2020/2

+220.000,00 +28,00 270.000,00

Not relevant

Ship size (m3) Reloadingability?

%Exemption inentrydirection %Exemption inexitdirection

0%

Planned

0%

Yes

| 59

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes exit

LNGTerminals France (PEG

FosCavaou

308,00

HubFrance (PEGSouth)

DESCRIPTIONOFTHEPROJECT

dŚĞƉƌŽũĞĐƚ ĂŝŵƐ ƚŽĞdžƉĂŶĚ ƚŚĞ>E'ƚĞƌŵŝŶĂů ĐĂƉĂĐŝƚLJ ĨƌŽŵϴ͘Ϯϱ ƚŽϭϲ͘ϱďĐŵͬLJ ƚŚƌŽƵŐŚ ƚŚĞĐŽŶƐƚƌƵĐƚŝŽŶŽĨ ƌĞŐĂƐŝĨŝĐĂƚŝŽŶƵŶŝƚƐ ĂŶĚƐƚŽƌĂŐĞ ƚĂŶŬƐ͘

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 60

ENTSOG–GRIPSouth 2013–2022AnnexA

1.5 FRANCE

Fos Faster LNG terminal projects

| 61

ENTSOG–GRIPSouth 2013–2022AnnexA

/1* 1

)RV )DVWHU /1*7HUPLQDO

1RQ ),'

LNGTerminal

SPONSORS

GENERAL INFORMATION

FINANCING

^ŚĞůů ;ϭϬйͿ

Promoter Operator TEN-EProject ?

Notpartof TEN-E Yes Fos Faster LNG Fos Faster LNG

InterestedbyPCI ? IGAs

None

WebLink

ǁǁǁ͘ĨŽƐĨĂƐƚĞƌ͘ĐŽŵ

d EͲ ZĞƋƵĞƐƚƐ

ĂƚĞŽĨ ZĞƋƵĞƐƚ

zĞĂƌ &ƵŶĚŝŶŐ'ƌĂŶƚĞĚ

EŽƚ LJĞƚ

hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ

sŽƉĂŬ ;ϵϬйͿ

THIRD-PARTYACCESSREGIME

SCHEDULE

TECHNICAL INFORMATION

Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime

Endof permittingphase

Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)

Negotiated (e.g. Exemption) Negotiated (e.g. Exemption)

2015

Fos Faster

FID Construction Commissioning Last completedPhase :

2015

+8,00

Not yet

2015 2019

+360.000,00 +24,00 270.000,00

Not yet

Ship size (m3) Reloadingability?

%Exemption inentrydirection %Exemption inexitdirection

0%

Market test

0%

Yes

| 62

ENTSOG–GRIPSouth 2013–2022AnnexA

PROJECTEDCAPACITY INCREASES

Interconnection

Capacity (GWh/d)

FromZone

ToZone

Modelled Direction Yes exit

Fos Faster

273,00

DESCRIPTIONOFTHEPROJECT

dŚĞƉƌŽũĞĐƚ ĂŝŵƐ ƚŽďƵŝůĚĂŶĞǁ>E'ƚĞƌŵŝŶĂů Ăƚ &ŽƐͲƐƵƌͲDĞƌŶĞĂƌDĂƌƐĞŝůůĞ ŝŶ&ƌĂŶĐĞǁŝƚŚĂŶ ŝŶƚŝĂů ϴďĐŵͬĂĐĂƉĂĐŝƚLJ ;ƵƉ ƚŽϭϲďĐŵͬĂͿ ĂůůŽǁŝŶŐĂůů ƚLJƉĞŽĨ >E'ĐĂƌƌŝĞƌƐ͘ KƵƌƉƌŽũĞĐƚĞĚ ƚĞƌŵŝŶĂů ŝƐĚĞĚŝĐĂƚĞĚ ƚŽďĞĂŶ ŝŶĚĞƉĞŶĚĞŶƚ͕ ŽƉĞŶĞĚĂŶĚŵƵůƚŝͲĐƵƐƚŽŵĞƌƐ ƚĞƌŵŝŶĂů͕ ŝŶĐůƵĚŝŶŐĂĂ ĨƵůů ƌĂŶŐĞŽĨ ƐŵĂůů ƐĐĂůĞ ƐĞƌǀŝĐĞƐ

COMMENTSABOUTTHEPROJECTFINANCING

Public financing

Private financing

Multilateral financing

| 63

ENTSOG–GRIPSouth 2013–2022AnnexA