ENTSOG GRIP South - Annex A: Infrastructure Projects
ENTSOG GRIP South - Annex A: Infrastructure Projects
GASREGIONAL INVESTMENTPLAN 2013–2022
ANNEXA: InfrastructureProjects GRIPSouth
1 FRANCE
| 2
ENTSOG–GRIPSouth 2013–2022AnnexA
1.1 FRANCE
GRTgaz pipelines, including compressionprojects
| 3
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-F-037
Entry capacity increase fromBelgium to France
FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
WƵďůŝĐ&ŝŶĂŶĐŝŶŐ ;ϭϬ͕ϬϬйͿ
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϵϬ͕ϬϬйͿ
&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2012
1
Regulated Regulated
FID Construction Commissioning Last completedPhase :
2010Q2
+51,00
No
2012 2013/4
+8,00
Not relevant
%Exemption inentrydirection %Exemption inexitdirection
0%
Permitting
0%
| 4
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry
HubBelgium
Blarégnies (BE) /Taisnières (H) (FR) (Segeo/Troll)
50,00
HubFrance (PEGNorth)
DESCRIPTIONOFTHEPROJECT
dƌĂŶƐŵŝƐƐŝŽŶƐLJƐƚĞŵƐĚĞǀĞůŽƉŵĞŶƚ;ƐͿ ŝŶ&Z ;ĂŶĚ Ϳ ƚŽ ŝŶĐƌĞĂƐĞĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶ&ZĂƚ dĂŝƐŶŝğƌĞƐ ;ĨƌŽŵϱϵϬ ƚŽϲϰϬ'tŚͬĚͿ ͲK^ ŝŶϮϬϬϵͬϮϬϭϬ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 5
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-F-039
Iberian-French corridor:WesternAxis (CSChazelles)
FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ
WƵďůŝĐ&ŝŶĂŶĐŝŶŐ ;ϱϬ͕ϬϬйͿ
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
'ZdŐĂnj ƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Regulated Regulated
2012
1
FID Construction Commissioning Last completedPhase :
2010Q1
No
2012 2013/1
+36,00
Not relevant
%Exemption inentrydirection %Exemption inexitdirection
0%
Permitting
0%
| 6
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry Yes exit
HubFrance (PEGTIGF) HubFrance (PEGSouth)
PIRMIDI
175,00 70,00
HubFrance (PEGTIGF) HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
'ZdŐĂnj ĐŽŶƚƌŝďƵƚŝŽŶ ƚŽ ƚŚĞ ƚƌĂŶƐŵŝƐƐŝŽŶƐLJƐƚĞŵƐĚĞǀĞůŽƉŵĞŶƚƐ ƚŽĚĞǀĞůŽƉ&ZͲ ^ /WĂƚ >ĂƌƌĂƵĂŶĚ ŝƌŝĂƚŽƵ͕K^ ŝŶϮϬϬϵͬϮϬϭϬ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 7
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-F-038
Developments for theDunkerque LNGnew terminal
FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf
WebLink
Private Financing (100,00%)
Specific developments, GRTgaz (100%)
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2013
2
Regulated Regulated
FID Construction Commissioning Last completedPhase :
2011Q4
+142,00
No
2013 2015/4
Not relevant
%Exemption inentrydirection %Exemption inexitdirection
0%
FEED
0%
| 8
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry
HubFrance (PEGNorth)
Dunkerque LNG / FRn
250,00
HubFrance (PEGNorth)
DESCRIPTIONOFTHEPROJECT
The connectionof the terminal needs spécific transmission systemdevelopement and core systemdevelopements (ArcdeDierrey)
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 9
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-F-040
Reverse capacity from France toBelgium at Veurne
FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
&ƌĞŶĐŚƐĞĐƚŝŽŶ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2014
1
Regulated Regulated
FID Construction Commissioning Last completedPhase :
2012Q2
+26,00
No
2014 2015/4
Not relevant
%Exemption inentrydirection %Exemption inexitdirection
0%
FID
0%
| 10
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes exit
HubFrance (PEGNorth)
New IPFR-BE (FR) /Alveringem-Maldegem (BE)
270,00
HubBelgium (ZeebruggeBeach)
DESCRIPTIONOFTHEPROJECT
EĞǁ/WŶĞĂƌsĞƵƌŶĞďĞƚǁĞĞŶ'ZdŐĂnjĂŶĚ&ůƵdžLJƐǁŝƚŚĐĂƉĂĐŝƚLJ ĨƌŽŵ&Z ƚŽ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 11
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-F-036
Arc deDierrey
FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
WƵďůŝĐ&ŝŶĂŶĐŝŶŐ ;ϭϮ͕ϬϬйͿ
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϴϴ͕ϬϬйͿ
ŽƌĞƐLJƐƚĞŵ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2014
2
Regulated Regulated
FID Construction Commissioning Last completedPhase :
2011Q4
+308,00
Not relevant
2014 2016
Not relevant
%Exemption inentrydirection %Exemption inexitdirection
0%
FID
0%
| 12
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
InterconnecƟon
Capacity (GWh/d)
FromZone
ToZone
Modelled DirecƟon Yes entry Yes entry Yes exit Yes exit Yes exit
HubFrance (PEGSouth) HubFrance (PEGNorth) HubGermany (NCG) HubFrance (PEGNorth)
Dunkerque LNG / FRn LiaisonNordSud
HubFrance (PEGNorth) HubFrance (PEGNorth) HubFrance (PEGNorth) HubFrance (PEGNorth) HubFrance (PEGSouth)
OlƟngue (FR) /Rodersdorf (CH) Medelsheim (DE) /Obergailbach (FR)
HubSwitzerland
DESCRIPTIONOFTHEPROJECT
This core systemdevelopment isnecessary for several projects in theNorth (Dunkerque LNG terminal,Mergerof theNorthandSouth zones, Reverse capacityatObergailbach, capaciƟes increaseatOlƟngue)
COMMENTSABOUTTHEPROJECTFINANCING
PublicĮnancing
PrivateĮnancing
MulƟlateral Įnancing
| 13
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-F-041
Eridan
FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
PublicFinancing (15,00%)
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf
WebLink
PrivateFinancing (85,00%)
Core system developments, GRTgaz (100%)
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2015
1
Regulated Regulated
FID Construction Commissioning Last completedPhase :
2011
+220,00
Not relevant
2015 2017
Not relevant
%Exemption inentrydirection %Exemption inexitdirection
0%
FID
0%
| 14
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
LiaisonNordSud InterconnecƟon
Capacity (GWh/d)
FromZone
ToZone
Modelled DirecƟon Yes exit Yes entry Yes entry Yes entry Yes exit
HubFrance (PEGTIGF) HubFrance (PEGSouth) HubFrance (PEGSouth) HubFrance (PEGSouth) HubFrance (PEGNorth)
HubFrance (PEGSouth) LNGTerminals France (PEG HubFrance (PEGSouth) HubFrance (PEGNorth) HubFrance (PEGTIGF)
PIRMIDI Fos (Tonkin/Cavaou)
PIRMIDI
DESCRIPTIONOFTHEPROJECT
Thisdevelopmentof the core transmission system, SaintMarƟndeCrau - SaintAvitpipeline, isnecessary for entry/exit capacity increases in theSouth zoneand tomerge theNorthanSouth zones.
COMMENTSABOUTTHEPROJECTFINANCING
PublicĮnancing
PrivateĮnancing
MulƟlateral Įnancing
EEPR
| 15
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-045
Reverse capacity fromCH to FR at Oltingue
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ͲͲ /ŶĨƌĂƐƚƌƵĐƚƵƌĞ WƌŽũĞĐƚƐ ;ϭϬϬйͿ
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Regulated Regulated
1
FID Construction Commissioning Last completedPhase :
Not relevant
Not relevant
2017
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 16
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction
DESCRIPTIONOFTHEPROJECT
ĞǀĞůŽƉĞŵĞŶƚƐŶĞĞĚĞĚ ƚŽĐƌĞĂƚĞ ƚŚŝƐ ƌĞǀĞƌƐĞĐĂƉĂĐŝƚLJ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 17
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-042
New interconnection IT-FR to connect Corsica
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf
WebLink
Undefined (100,00%)
French section, GRTgaz (100%)
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2 +320,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
Not relevant
Not relevant
2018
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 18
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction No entry
Hub Italia (Sardinia)
Porto-Vecchio
20,00
HubFrance (Corsica)
DESCRIPTIONOFTHEPROJECT
Thisproject is linked to theGALSI project and includes anoffshorepipeline fromSardinia toCorsicaandonshorepipelines inCorsica
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
Expected
| 19
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-043
Val de Saône project
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf
WebLink
Private Financing (100,00%)
Core system developments, GRTgaz (100%)
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
1 +190,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
Not relevant
+9,00
Not relevant
2018
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 20
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
LiaisonNordSud Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry Yes exit
HubFrance (PEGNorth) HubFrance (PEGSouth)
999,00 999,00
HubFrance (PEGNorth) HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
This reinforcement of the French Network consists in the looping of the Bourgogne pipeline (between Etrez and Voisines). In addition to the projetcs Arc de Dierrey in the North and ERIDAN in the South, this project is needed tomerge GRTgaz'sNorthandSouthmarket zones.
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 21
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-044
New interconnection to Luxembourg
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
ǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĞŶͬŚŽŵĞͬŵĂũŽƌͲƉƌŽũĞĐƚƐͬƉůĂŶͲ ĚĞĐĞŶŶĂůͬϭϬͲLJĞĂƌͲĚĞǀĞůŽƉŵĞŶƚͬ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2 +71,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
No
Not relevant
2018
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 22
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes exit Yes exit
HubFrance (PEGNorth) HubFrance (PEGNorth)
New IPFrance/Luxemburg
9,00 40,00
Hub Luxemburg Hub Luxemburg
DESCRIPTIONOFTHEPROJECT
EĞǁŝŶƚĞƌĐŽŶŶĞĐƚŝŽŶ ĨŽƌ ĂĚĚŝƚŝŽŶĂů ĨŝƌŵĞŶƚƌLJ ĐĂƉĂĐŝƚŝLJ ĨƌŽŵ&ƌĂŶĐĞ ƚŽ>ƵdžĞŵďŽƵƌŐ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 23
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-048
Developments forMontoir LNG terminal expansion at 12,5bcm - 1
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
1 +63,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
Not relevant
+10,00
Not relevant
2018
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 24
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry
LNGTerminals France (PEG
MontoirdeBretagne
55,00
HubFrance (PEGNorth)
DESCRIPTIONOFTHEPROJECT
dŚŝƐĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶĐƌĞĂƐĞĂƚDŽŶƚŽŝƌŽŶůLJŶĞĞĚƐ ƐƉĞĐŝĨŝĐĚĞǀĞůŽƉŵĞŶƚƐ͘
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 25
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-253
Est Lyonnais pipeline
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
ŽƌĞƐLJƐƚĞŵ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
3 +170,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
2015
No
Not relevant
2019
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 26
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry
LNGTerminals France (PEG
Fos (Tonkin/Cavaou)
HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
dŚŝƐĚĞǀĞůŽƉŵĞŶƚŽĨ ƚŚĞĐŽƌĞ ƚƌĂŶƐŵŝƐŝŽŶƐLJƐƚĞŵŝƐŶĞĐĞƐƐĂƌLJ ƚŽĚĞǀĞůŽƉĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶ ƚŚĞ^ŽƵƚŚ ;&ŽƐWƌŽũĞĐƚƐ͕ /WǁŝƚŚƐƉĂŝŶ͕ ƐƚŽƌĂŐĞƐͿ ĂŶĚĐŽŶƚƌŝďƵƚĞ ƚŽ ƚŚĞ^ŽƵƚŚͲEŽƌƚŚĐŽƌƌŝĚŽƌ ŝŶtĞƐƚĞƌŶ ƵƌŽƉĞ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 27
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-254
Developments for the Fos faster LNGnew terminal
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf
WebLink
Private Financing (100,00%)
Specific developments, GRTgaz (100%)
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
1 +30,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
2015
No
Not relevant
2019
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 28
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry No entry
LNGTerminals France (PEG LNGTerminals France (PEG
Fos (Tonkin/Cavaou)
255,00 383,00
HubFrance (PEGSouth) HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
Inaddition to this specific connection, the reinforcementof the core transmission system is alsoneeded (ERIDAN, East Lyonnaispipeline,Bourgogneand/or compressionsdependingon thedevelopments already realized)
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 29
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-255
Fos Tonkin LNG expansion
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E no
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Regulated Regulated
1
FID Construction Commissioning Last completedPhase :
No
Not relevant
2019
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 30
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry
LNGTerminals France (PEG
Fos (Tonkin/Cavaou)
80,00
HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
KŶůLJ ĐŽƌĞƐLJƐƚĞŵĚĞǀĞůŽƉŵĞŶƚƐ ĂƌĞŶĞĞĚĞĚ ĨŽƌ ƚŚŝƐĞdžƉĂŶƐŝŽŶ ͗ ƚŚĞLJǁŝůů ĚĞƉĞŶĚŽŶ ƚŚĞŽƚŚĞƌ ĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶĐƌĞĂƐĞƐ ŝŶ ƚŚĞ^ŽƵƚŚnjŽŶĞ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 31
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-047
Reverse capacity from France toGermany at Obergailbach
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
1 +60,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
No
+42,00
Not relevant
2020
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 32
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction No exit Yes exit No exit
HubFrance (PEGNorth) HubFrance (PEGNorth) HubFrance (PEGNorth)
Medelsheim (DE) /Obergailbach (FR)
180,00 100,00 250,00
HubGermany (NCG) HubGermany (NCG) HubGermany (NCG)
DESCRIPTIONOFTHEPROJECT
dŚŝƐƉƌŽũĞĐƚ ŝŶĐůƵĚĞƐƉŝƉĞůŝŶĞƐ ;ŝŶĐůƵĚŝŶŐĐŽŵƉƌĞƐƐŝŽŶͿ ĂŶĚĐŚĂŶŐĞƐ ŝŶ ƚŚĞŽĚŽƌŝƐĂƚŝŽŶƐLJƐƚĞŵ;ƌĞƉůĂĐŝŶŐŽĚŽƌŝƐƚĂŝŽŶƐƚĂƚŝŽŶƐ Ăƚ ƚŚĞĞŶƚƌLJŽĨ ƚŚĞ ƚƌĂŶƐŵŝƐƐŝŽŶƐLJƐƚĞŵďLJŽĚŽƌŝƐĂƚŝŽŶƐƚĂƚŝŽŶƐ Ăƚ ƚŚĞĞŶƚƌLJŽĨ ƚŚĞ ƌĞŐŝŽŶĂů ŶĞƚǁŽƌŬƐͿ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 33
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-256
Iberian-French corridor: EasternAxis-Midcat Project (CSMontpellier andCSSaintMartindeCrau)
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E yes
InterestedbyPCI ? IGAs
None
http://www.grtgaz.com/fileadmin/plaquettes/en/10year s2013_2022_EN.pdf
WebLink
Private Financing (100,00%)
GRTgaz section - Specific developments, GRTgaz (100%)
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Regulated Regulated
1
FID Construction Commissioning Last completedPhase :
No
+30,00
Not relevant
2021
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 34
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry Yes exit
HubFrance (PEGTIGF) HubFrance (PEGSouth)
PIRMIDI
230,00 80,00
HubFrance (PEGTIGF) HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
GRTgaz contribution to develop a newFR-ES IP on the Eastern axis -MidCat. In addition to these specific developments, the reinforcement of the core transmission system is also needed (ERIDAN, Arc Lyonnais pipeline, Val de Saône project and/or compressionsdependingon thedevelopments already realized)
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 35
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-269
Fosmax (Cavaou) LNG expansion
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E no
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Regulated Regulated
1
FID Construction Commissioning Last completedPhase :
No
Not relevant
2020
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 36
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry
LNGTerminals France (PEG
Fos (Tonkin/Cavaou)
327,00
HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
KŶůLJ ĐŽƌĞƐLJƐƚĞŵĚĞǀĞůŽƉŵĞŶƚƐ ĂƌĞŶĞĞĚĞĚ ĨŽƌ ƚŚŝƐĞdžƉĂŶƐŝŽŶ ͗ ƚŚĞLJǁŝůů ĚĞƉĞŶĚŽŶ ƚŚĞŽƚŚĞƌ ĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶĐƌĞĂƐĞƐ ŝŶ ƚŚĞ^ŽƵƚŚnjŽŶĞ͘
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 37
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-257
New lineBetweenChemery andDierrey
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
ŽƌĞƐLJƐƚĞŵ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
1 +210,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
Not relevant
Not relevant
2021
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 38
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry
LNGTerminals France (PEG
MontoirdeBretagne
HubFrance (PEGNorth)
DESCRIPTIONOFTHEPROJECT
dŚŝƐ ĐŽƌĞƐLJƐƚĞŵĚĞǀĞůŽƉŵĞŶƚĚĞǀĞůŽƉtĞƐƚͲ ĂƐƚ ĐĂƉĂĐŝƚLJ ƚƌĂŶƐŝƚ ŶĞĐĞƐƐĂƌLJ ĨŽƌDŽŶƚŽŝƌ >E'ƚĞƌŵŝŶĂů ĞdžƉĂŶƐŝŽŶϮĂŶĚ ĨŝƌŵƌĞǀĞƌƐĞ ĨůŽǁƚŽ'ĞƌŵĂŶLJ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 39
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-258
Developments forMontoir LNG terminal expansion at 16,5bcm - 2
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
1 +200,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
Not relevant
Not relevant
2021
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 40
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry
LNGTerminals France (PEG
MontoirdeBretagne
125,00
HubFrance (PEGNorth)
DESCRIPTIONOFTHEPROJECT
dŚŝƐĞŶƚƌLJ ĐĂƉĂĐŝƚLJ ŝŶĐƌĞĂƐĞĂƚDŽŶƚŽŝƌ ŶĞĞĚƐ ƐƉĞĐŝĨŝĐĚĞǀĞůŽƉŵĞŶƚƐ ĂŶĚĐŽƌĞ ƐLJƐƚĞŵĚĞǀĞůŽƉŵĞŶƚƐ ;EĞǁůŝŶĞďĞƚǁĞĞŶ ŚĞŵĞƌLJĂŶĚ ŝĞƌƌĞLJͿ͘
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 41
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-046
Exit capacity increase toCH at Oltingue
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
GRTgaz GRTgaz
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ŐƌƚŐĂnj͘ĐŽŵͬĨŝůĞĂĚŵŝŶͬƉůĂƋƵĞƚƚĞƐͬĞŶͬϭϬLJĞĂƌ ƐϮϬϭϯͺϮϬϮϮͺ E͘ƉĚĨ
WebLink
WƌŝǀĂƚĞ&ŝŶĂŶĐŝŶŐ ;ϭϬϬ͕ϬϬйͿ
&ƌĞŶĐŚƐĞĐƚŝŽŶ Ͳ ^ƉĞĐŝĨŝĐ ĚĞǀĞůŽƉŵĞŶƚƐ͕ 'ZdŐĂnj ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Regulated Regulated
3
FID Construction Commissioning Last completedPhase :
No
+30,00
Not relevant
2022
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
| 42
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes exit No exit
HubFrance (PEGNorth) HubFrance (PEGNorth)
Oltingue (FR) /Rodersdorf (CH)
100,00 40,00
HubSwitzerland HubSwitzerland
DESCRIPTIONOFTHEPROJECT
^ƉĞĐŝĨŝĐ ƚƌĂŶƐŵŝƐƐŝŽŶƐLJƐƚĞŵĚĞǀĞůƉĞŵĞŶƚƐ ƚŽ ŝŶĐƌĞĂƐĞĞdžŝƚ ĐĂƉĂĐŝƚLJ ƚŽ ,;ĚĞƐŝŐŶ ƚŽĐŽŶĨŝƌŵĂĐĐŽƌĚŝŶŐ ƚŽ ƚŚĞŵĂƌŬĞƚĚĞŵĂŶĚͿ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 43
ENTSOG–GRIPSouth 2013–2022AnnexA
1.2 FRANCE
TIGFpipelines, including compressionprojects
| 44
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-F-250
Girland - Artère deGuyennePhaseB
FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
TIGF TIGF
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
WebLink
ǁǁǁ͘ƚŝŐĨ͘Ĩƌ
hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ
d/'& ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2012Q3
1
Regulated Regulated
FID Construction Commissioning Last completedPhase :
2010Q1
+58,00
No
2012Q4 2013/3
+5,50
No
%Exemption inentrydirection %Exemption inexitdirection
0%
0%
| 45
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
InterconnecƟon
Capacity (GWh/d)
FromZone
ToZone
Modelled DirecƟon No exit No entry Yes entry Yes exit
HubFrance (PEGTIGF) HubFrance (PEGTIGF) HubFrance (PEGSouth) HubFrance (PEGSouth)
PIRMIDI
175,00 180,00 185,00 70,00
HubFrance (PEGTIGF) HubFrance (PEGTIGF) HubFrance (PEGSouth) HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
It's aDN900and58km longpipeline that conects theUGSof LussagnetwithCapƟeuxwithanaddiƟonal compressionat Sauveterre (thathasbeendecided in June)
COMMENTSABOUTTHEPROJECTFINANCING
PublicĮnancing
PrivateĮnancing
MulƟlateral Įnancing
| 46
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-F-251
Artère de l'Adour (former Euskadour) (FR-ES interconnection)
FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
TIGF TIGF
Notpartof TEN-E No
InterestedbyPCI ? IGAs
None
WebLink
www.artere-adour-tigf.fr
Undefined (100,00%)
Arcangues-Coudures, TIGF (100%)
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2014Q1
1
Regulated Regulated
FID Construction Commissioning Last completedPhase :
2012Q1
+95,00
No
2014Q3 2015/4
Not relevant
%Exemption inentrydirection %Exemption inexitdirection
0%
FEED
0%
| 47
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
InterconnecƟon
Capacity (GWh/d)
FromZone
ToZone
Modelled DirecƟon Yes exit Yes entry
Biriatou (FR) / Irun (ES)
60,00 00,00
HubFrance (PEGTIGF) HubSpain
HubFrance (PEGTIGF) HubSpain
DESCRIPTIONOFTHEPROJECT
It's a24 inches and95km longpipelinebetweenArcangues andCoudures thatwill allow to connect (using theexisƟng infrastructure) theUGSof Lussagnetwith theSpanish fronƟer.
COMMENTSABOUTTHEPROJECTFINANCING
PublicĮnancing
PrivateĮnancing
MulƟlateral Įnancing
| 48
ENTSOG–GRIPSouth 2013–2022AnnexA
TRA-N-252
Iberian-French corridor: EasternAxis-Midcat Project
Non-FID
Pipeline includingCS
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
TIGF TIGF
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
WebLink
www.tigf.fr
Undefined (100,00%)
TIGF (100%)
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
#of Pipelines, nodes, CS Total Pipeline Length (km) Total CompressorPower (MW) Expected LoadFactor
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
2 +148,00
Regulated Regulated
FID Construction Commissioning Last completedPhase :
No
+10,00
No
2021
%Exemption inentrydirection %Exemption inexitdirection
0%
0%
| 49
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes entry Yes exit
HubSpain HubFrance (PEGTIGF)
LePerthus
230,00 80,00
HubSpain HubFrance (PEGTIGF)
DESCRIPTIONOFTHEPROJECT
In theFrench side, it's composedby a120kmlongpipelinebetween the frontier (near LePerthus) and theCSof Barbaira, the installationof anaditional compressionof 10MWat Barbaira, anda28kmlongpipelinebetween Lupiac andBaran (ArtèreduGascogne).
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 50
ENTSOG–GRIPSouth 2013–2022AnnexA
FRANCE EdFLNG terminal projects
| 51
ENTSOG–GRIPSouth 2013–2022AnnexA
/1* )
'XQNHUTXH /1*7HUPLQDO
),'
LNGTerminal
SPONSORS
GENERAL INFORMATION
FINANCING
TOTAL (10%)
Promoter Operator TEN-EProject ?
Notpartof TEN-E Notdefinedyet EdF Dunkerque LNG
FLUXYS (25%)
InterestedbyPCI ? IGAs
None
WebLink
Private Financing (100,00%)
EDF (65%)
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)
Negotiated (e.g. Exemption) Negotiated (e.g. Exemption)
2010Q2
Dunkerque LNG
FID Construction Commissioning Last completedPhase :
2011Q2
+13,00
Yes
2011Q3 2015/4
+570.000,00 +45,60 267.000,00
Yes
Ship size (m3) Reloadingability?
%Exemption inentrydirection %Exemption inexitdirection
100%
FID
100%
Yes
| 52
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
InterconnecƟon
Capacity (GWh/d)
FromZone
ToZone
Modelled DirecƟon Yes exit Yes exit Yes exit
519,00 501,60 270,00
HubFrance (PEGNorth) LNGTerminals France (PEG
HubFrance (PEGNorth) (Dunkerque) HubFrance (PEGNorth)
Dunkerque LNG / FRn Dunkerque LNG Dunkerque LNG /Avringem - BE
DESCRIPTIONOFTHEPROJECT
LNG regasiĮcaƟonFacility located inDunkirk
COMMENTSABOUTTHEPROJECTFINANCING
PublicĮnancing
PrivateĮnancing
MulƟlateral Įnancing
| 53
ENTSOG–GRIPSouth 2013–2022AnnexA
1.4 FRANCE
ElengyLNG terminal projects
| 54
ENTSOG–GRIPSouth 2013–2022AnnexA
/1* 1
0RQWRLU /1*7HUPLQDO ([SDQVLRQ
1RQ ),'
LNGTerminal
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
Elengy Elengy
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
WebLink
ǁǁǁ͘ĞůĞŶŐLJ͘ĐŽŵͬĞŶͬƉƌŽũĞĐƚƐͬŵŽŶƚŽŝƌͲĞdžƚĞŶƐŝŽŶ͘Śƚŵů
hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ
ůĞŶŐLJ ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)
Regulated Regulated
2016Q1
Montoir LNGTerminal
FID Construction Commissioning Last completedPhase :
2016Q1
+6,50
No
2016Q2 2019/4
+190.000,00 +20,00 265.000,00
Not relevant
Ship size (m3) Reloadingability?
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
Yes
| 55
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes exit
LNGTerminals France (PEG
MontoirdeBretagne
220,00
HubFrance (PEGNorth)
DESCRIPTIONOFTHEPROJECT
dŚĞƉƌŽũĞĐƚ ĂŝŵƐ ƚŽĞdžƉĂŶĚ ƚŚĞ>E'ƚĞƌŵŝŶĂů ĐĂƉĂĐŝƚLJ ĨƌŽŵϭϬ ƚŽϭϲ͘ϱďĐŵͬLJ ƚŚƌŽƵŐŚ ƚŚĞĐŽŶƐƚƌƵĐƚŝŽŶŽĨ ƌĞŐĂƐŝĨŝĐĂƚŝŽŶƵŶŝƚƐ ĂŶĚƐƚŽƌĂŐĞ ƚĂŶŬƐ͘
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 56
ENTSOG–GRIPSouth 2013–2022AnnexA
/1* 1
)RV 7RQNLQ /1*7HUPLQDO ([SDQVLRQ
1RQ ),'
LNGTerminal
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
Elengy Elengy
Projectof Common Interest No
InterestedbyPCI ? IGAs
None
ǁǁǁ͘ĞůĞŶŐLJ͘ĐŽŵͬĞŶͬƉƌŽũĞĐƚƐͬĨŽƐͲƚŽŶŬŝŶͲŽƉĞŶͲ ƐĞĂƐŽŶ͘Śƚŵů
WebLink
d EͲ ZĞƋƵĞƐƚƐ
ĂƚĞŽĨ ZĞƋƵĞƐƚ
zĞĂƌ &ƵŶĚŝŶŐ'ƌĂŶƚĞĚ
Ϯϴ͘ϬϮ͘ϮϬϭϭ
EŽƚ LJĞƚ
hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ
ůĞŶŐLJ ;ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)
Regulated Regulated
2015Q3
FosTonkin LNGTerminal
FID Construction Commissioning Last completedPhase :
2015Q3
+2,50
No
2016Q2 2019/4
+80.000,00 +7,60 75.000,00
Not relevant
Ship size (m3) Reloadingability?
%Exemption inentrydirection %Exemption inexitdirection
0%
Market test
0%
Yes
| 57
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes exit
LNGTerminals France (PEG
Fos Tonkin
132,00
HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
dŚĞƉƌŽũĞĐƚ ĂŝŵƐ ƚŽƉƌŽůŽŶŐ ƚŚĞŽƉĞƌĂƚŝŽŶŽĨ ƚŚĞ>E'ƚĞƌŵŝŶĂů ƚŝůů ϮϬϯϱĂŶĚ ƚŽĞdžƉĂŶĚ ŝƚƐ ĐĂƉĂĐŝƚLJ ƚŽϱ͘ϱďĐŵͬLJ ƚŚƌŽƵŐŚ ŝŶƉĂƌƚŝĐƵůĂƌ ƚŚĞĐŽŶƐƚƌƵĐƚŝŽŶŽĨ ĂŶĞǁ>E'ƐƚŽƌĂŐĞ ƚĂŶŬ͘
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 58
ENTSOG–GRIPSouth 2013–2022AnnexA
/1* 1
)RV &DYDRX /1*7HUPLQDO ([SDQVLRQ
1RQ ),'
LNGTerminal
SPONSORS
GENERAL INFORMATION
FINANCING
Promoter Operator TEN-EProject ?
Elengy Fosmax LNG
Notpartof TEN-E Yes
InterestedbyPCI ? IGAs
None
ŚƚƚƉ͗ͬͬǁǁǁ͘ĨŽƐŵĂdžͲůŶŐ͘ĐŽŵͬĞŶͬǁŚŽͲĂƌĞͲǁĞͬƉƌŽũĞƚͲĚĞͲ ĚĞǀĞůŽƉƉĞŵĞŶƚ͘Śƚŵů
WebLink
d EͲ ZĞƋƵĞƐƚƐ
ĂƚĞŽĨ ZĞƋƵĞƐƚ
zĞĂƌ &ƵŶĚŝŶŐ'ƌĂŶƚĞĚ
ϮϬ͘ϬϮ͘ϮϬϭϯ
EŽƚ LJĞƚ
hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ
&ŽƐŵĂdž >E';ϭϬϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)
Regulated Regulated
2016Q2
FosCavaou LNGTerminal
FID Construction Commissioning Last completedPhase :
2016Q2
+8,25
No
2016Q2 2020/2
+220.000,00 +28,00 270.000,00
Not relevant
Ship size (m3) Reloadingability?
%Exemption inentrydirection %Exemption inexitdirection
0%
Planned
0%
Yes
| 59
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes exit
LNGTerminals France (PEG
FosCavaou
308,00
HubFrance (PEGSouth)
DESCRIPTIONOFTHEPROJECT
dŚĞƉƌŽũĞĐƚ ĂŝŵƐ ƚŽĞdžƉĂŶĚ ƚŚĞ>E'ƚĞƌŵŝŶĂů ĐĂƉĂĐŝƚLJ ĨƌŽŵϴ͘Ϯϱ ƚŽϭϲ͘ϱďĐŵͬLJ ƚŚƌŽƵŐŚ ƚŚĞĐŽŶƐƚƌƵĐƚŝŽŶŽĨ ƌĞŐĂƐŝĨŝĐĂƚŝŽŶƵŶŝƚƐ ĂŶĚƐƚŽƌĂŐĞ ƚĂŶŬƐ͘
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 60
ENTSOG–GRIPSouth 2013–2022AnnexA
1.5 FRANCE
Fos Faster LNG terminal projects
| 61
ENTSOG–GRIPSouth 2013–2022AnnexA
/1* 1
)RV )DVWHU /1*7HUPLQDO
1RQ ),'
LNGTerminal
SPONSORS
GENERAL INFORMATION
FINANCING
^ŚĞůů ;ϭϬйͿ
Promoter Operator TEN-EProject ?
Notpartof TEN-E Yes Fos Faster LNG Fos Faster LNG
InterestedbyPCI ? IGAs
None
WebLink
ǁǁǁ͘ĨŽƐĨĂƐƚĞƌ͘ĐŽŵ
d EͲ ZĞƋƵĞƐƚƐ
ĂƚĞŽĨ ZĞƋƵĞƐƚ
zĞĂƌ &ƵŶĚŝŶŐ'ƌĂŶƚĞĚ
EŽƚ LJĞƚ
hŶĚĞĨŝŶĞĚ ;ϭϬϬ͕ϬϬйͿ
sŽƉĂŬ ;ϵϬйͿ
THIRD-PARTYACCESSREGIME
SCHEDULE
TECHNICAL INFORMATION
Applied for Exemption? Exemptiongranted? ConsideredTPARegime ConsideredTariffRegime
Endof permittingphase
Regasification facility Expectedvolume (bcm/y) Storage capacity (m3) Send-out (mcm/d)
Negotiated (e.g. Exemption) Negotiated (e.g. Exemption)
2015
Fos Faster
FID Construction Commissioning Last completedPhase :
2015
+8,00
Not yet
2015 2019
+360.000,00 +24,00 270.000,00
Not yet
Ship size (m3) Reloadingability?
%Exemption inentrydirection %Exemption inexitdirection
0%
Market test
0%
Yes
| 62
ENTSOG–GRIPSouth 2013–2022AnnexA
PROJECTEDCAPACITY INCREASES
Interconnection
Capacity (GWh/d)
FromZone
ToZone
Modelled Direction Yes exit
Fos Faster
273,00
DESCRIPTIONOFTHEPROJECT
dŚĞƉƌŽũĞĐƚ ĂŝŵƐ ƚŽďƵŝůĚĂŶĞǁ>E'ƚĞƌŵŝŶĂů Ăƚ &ŽƐͲƐƵƌͲDĞƌŶĞĂƌDĂƌƐĞŝůůĞ ŝŶ&ƌĂŶĐĞǁŝƚŚĂŶ ŝŶƚŝĂů ϴďĐŵͬĂĐĂƉĂĐŝƚLJ ;ƵƉ ƚŽϭϲďĐŵͬĂͿ ĂůůŽǁŝŶŐĂůů ƚLJƉĞŽĨ >E'ĐĂƌƌŝĞƌƐ͘ KƵƌƉƌŽũĞĐƚĞĚ ƚĞƌŵŝŶĂů ŝƐĚĞĚŝĐĂƚĞĚ ƚŽďĞĂŶ ŝŶĚĞƉĞŶĚĞŶƚ͕ ŽƉĞŶĞĚĂŶĚŵƵůƚŝͲĐƵƐƚŽŵĞƌƐ ƚĞƌŵŝŶĂů͕ ŝŶĐůƵĚŝŶŐĂĂ ĨƵůů ƌĂŶŐĞŽĨ ƐŵĂůů ƐĐĂůĞ ƐĞƌǀŝĐĞƐ
COMMENTSABOUTTHEPROJECTFINANCING
Public financing
Private financing
Multilateral financing
| 63
ENTSOG–GRIPSouth 2013–2022AnnexA