ERECTION SEQUENCE

STEP 1

RAKE ANGLE

MVF/MVP PANEL CLIP W/ (2)#12-14 X 1-1/4" (WALL COLOR) (TYP.)

RAKE ANGLE Attach the rake angle so that it is straight and true to the top of the purlins with (2) #12-14 X 1 1/4” (for purlins) or field welded (for bar joists) at each purlin. Since the top leg of the eave strut is higher than the top flange of the purlins, the rake angle will need to be notched and field bent to the eave strut web or notched and attached to the corner angle. Refer to the erection drawings for how far the face of the angle is away from the edge of the purlin. Install angle so that the short leg of the angle is on the top of the purlins. Make sure that the rake angle is installed so that it is flush with the wall girts. MVF/MVP clips are to be placed even with the face of the rake angle and in close proximity to each purlin. Do not place closer than 3” to the fastener attaching the rake angle to the purlins. Hold the clip on the downhill side of the ridge purlin. Install the panel clip with (2)#12-14 X 1 1/4”, wall color.

CLEARANCE 3"

PURLIN

EAVE STRUT

STEEL LINE

(2) #12-14 X 1 1/4" (WALL COLOR)

A-20-B RAKE ANGLE

PURLIN (BEYOND)

Refer to erection drawing purlin details.

WALL PANEL

INSULATION

CAUTION ALL PRIMARY AND SECONDARY FRAMING SHOULD BE ERECTED, PLUMBED, AND BOLTS TIGHTENED PRIOR TO PANELING.