Aéroport de Paris - 2018 Registration document

BUSINESS OVERVIEW 06 DESCRIPTION OF THE PARISIAN AIRPORTS OWNED OR OPERATED BY GROUPE ADP

regulated scope over the considered period. With regard to the Paris-Orly platform, the proposed projects are summarised in the mapping below:

As part of the preparation for the 2021-2025 Economic Regulation Agreement, on 2 April 2019, ADP published the Public Consultation Document, including notably a proposal for the investment plan for the

the creation of contact aircraft parking stand capacity (creation of an Mi8 stand) and remote parking stand areas (creation and reconfiguration of the Golf areas). With regard to access, the road network would be completely redesigned after the opening of the Grand Paris station, to facilitate access to Halls 1, 2, 3 and 4. A multi-storey car park would be built at that station. A large forecourt would be built to improve drop-offs and bring them in line with traffic in these halls and to create a bus station at the heart of the intermodal hub. Finally, a new interchange would be built at the north of the platform, arriving from Paris, to streamline traffic.

The main projects to be proposed are as follows: ◆ the reconfiguration of the West airside infrastructures with the creation of by-pass taxiways, the extension to aircraft aprons and the creation of primary de-icing areas; ◆ the creation of a boarding lounge for the Québec areas , to the west of the platform that is fully connected to the terminals via a dedicated and innovative path; ◆ the merger of Halls 1 and 2 by the extension of the surface area of the boarding lounges; ◆ the upgrade of Hall 4 (large lounge and arrival process) by the upgrading to boarding capacities, luggage delivery and arrival areas,

64

AÉROPORTS DE PARIS ® REGISTRATION DOCUMENT 2018

Made with FlippingBook HTML5