CASE STUDY: CAMBRIDGESHIRE POLICE WORKSHOPS FIT-OUT OF NEW SITE

ADDITIONAL WORK REQUESTED • Floor Finishing and Line Painting • Final Equipment Electrical Connection

EQUIPMENT REQUIRED • Eight 2 Post lifts • Two Recessed Electro-hydraulic Motorcycle Scissor Lifts • One 4T 4 Post ATL/Alignment dual revenue Lift

• Overhead Exhaust Extraction with 7 drops • Compressed Air Ring Main with 15 drops • Oil Storage and Distribution System

Estimated Project Duration:

10 weeks 10 weeks

Actual Project Duration:

The project came about because of a need to amalgamate a number of smaller workshops into one site. The site was a new empty building.

Our programme of works was approved, and the project commenced.

The larger lifts and air ringmain went in first

Followed by the motorcycle lifts

And then the Extraction and the Lubricant systems

Finally the floor was finished, including line painting to the requirement.

“Eurocarparts executed this project in a timely and efficient manner. At all times they kept me informed of progress and in addition were very tidy. They were very easy to deal with.” Mick Wooding, Workshop Manager, Cambridgeshire Constabulary

†Finance example typically based on a 5 year lease purchase agreement. Finance subject to status, full terms and conditions available on request. Other finance options available. All prices exclude VAT at 20%. Price, availability and specification may change without prior notice. Warranty subject to manufacturers terms and conditions of use. Errors and omissions excluded. Offers valid until 30th June 2017. Prices correct at time of going to press: March 2017.