Secondary and Cumulative Impacts Master Management Plan - 2014
Connector between Clements Drive and Green Drive
Ü
Four-Lane Boulevard New Four-Lane Boulevard Six-Lane Boulevard New Six-Lane Boulevard Expressway New Expressway Future Roadways
Morrisville Future Roadway Type Two-Lane Roadway New Two-Lane Roadway Two-Lane Boulevard New Two-Lane Boulevard Four-Lane Roadway New Four-Lane Roadway
County Boundary Morrisville Planning Jurisdiction Lakes Railroad Roads
¹ º » ¼
At-grade RR Crossing
D
At-grade RR Crossing to be Closed
0
0.125
0.25
0.5
0.75
1
Miles
Existing Grade Separation Planned Grade Separation
Roadway = No median Boulevard = Roadway with planted median
Updated March 24, 2009
Made with FlippingBook flipbook maker