SPIFAN Stakeholder Panel (March 15, 2017)

19

Fitness-for-Purpose • Very early in process • General statement of method performance • No or few acceptance criteria

SMPR • A deliverable • Very detailed specification of method performance requirements • Acceptance criteria • 2 to 3 pages • Standard format

• 1 or 2 paragraphs • No formal format • Not a standard

• Formal AOAC standard • Published in the OMA

20

Made with