Wireline - Summer 2017
ProMILL TRIP-SAVING MILLING AND UNDERREAMING SYSTEM
High-ratio underreamer
Section mill
Bridge plug assembly
Cut your well abandonment milling costs in a single trip. The ProMILL* trip-saving milling and underreaming system combines a bridge plug assembly, a section mill, and a high-ratio underreamer to achieve rock-to-rock zonal isolation. This prepares the foundation for an abandonment cement barrier in a single run, rather than in four as required by conventional systems. One operator in the North Sea saved 7.5 rig days and USD 1 million using the ProMILL system—why not you?
Find out more at slb.com/promill
*Mark of Schlumberger. Copyright © 2017 Schlumberger. All rights reserved. 17-BDT-228892
1 2
| W I R E L I N E | SUMMER 2017
Made with FlippingBook - Online magazine maker