Applications Where Center-Feeding Main Module is Required
SUITABLE FOR CENTER-FEED APPLICATIONS ONLY † † Horizontal bus is rated 1200 amps maximum. The load on the horizon- tal bus may not exceed 1200 amps in either direction from the point of connection of the main circuit breaker. Overall load is limited to the rating of the main circuit breaker.
For applications where the main module ampere rating is greater than that of the meter stack horizontal bus, the main module must be placed in the middle of the lineup (Figure A). The engineer of record must provide calculations on the plans to show that the horizontal bussing will not be overloaded on either side. This situation, called “Center-Feeding”, can happen in either 800A or 1200A horizontal bus meter stack applications, depending on the main ampere rating. Refer to chart below for amperage and bus information. NOTE: Figure B shows the incorrect configurations.
Does the Application Require Electrician to Center-Feed the Main Module?
Amps of Main Breaker, Lug or Switch
800A Horizontal Bus
1200 Horizontal Bus
400A – 800A
No
No No
1000A
Yes
1200A
Yes
No
1400A
Yes
Yes
1600A
Yes
Yes
2000A
Yes
Yes
Main ain
Main
Main
Correct This configuration is centered and will balance the load between left and right-side horizontal bus leaving the main section
Incorrect This configuration will overload the left-side horizontal bus that leaves the main section
Incorrect This configuration will overload the right-side horizontal bus that leaves the main section