GE Products BuyLog Smart Catalog

Uninterruptible Power Supplies Energy Connections TLE Series UPS 225 - 1000 kVA External Maintenance Bypass Cabinets

Section 20

Series TLE UPS - 3 Breaker Matching, Free Standing Maintenance Bypass Cabinet (MBC)

TLE UPS kVA

UIB CB (Trip Rating) 400AT (80%) 450AT (80%) 600AT (100%) 700AT (100%) 1200AT (100%) 1600AT (100%)

MIB & MBB CB (Trip Rating)

kAIC Rating @ 480VAC

Width (in)

Depth (in)

Height (in)

Weight (lbs)

Product Number

75 75 75 75 75 75

310 360 360 630 710

MBC224-35400T-L600 MBC254-40450T-L600 MBC404-60600T-L600 MBC504-80700T-L600 MBC754-A0A20T-L600 MBCA04-A6A60T-L600

225 250 400 500 750

350AT (80%) 400AT (80%) 600AT (80%) 800AT (80%)

65kAIC 65kAIC 65kAIC 65kAIC 65kAIC 65kAIC

30.0 30.0 30.0 36.0 36.0 92.0

32.8 32.8 32.8 32.8 32.8 32.8

1000AT (100%) 1600AT (100%)

1000

1200

Notes on TLE Matching MBC: 1. Cabinets are matching height, depth, and black in color same as UPS Module 2. Baseline configuration is 3-Breaker Type, 480/277V 3ph 4w + gnd. Neutral not used in 3w UPS applications. 3. Base MBC includes 3-breaker with mechanical Kirk Key configuration.

For 3-breaker MBC with electric interlock (with SKRU) change, the Base MBC, digit #15 to "K", example: MBC224-35400T-K600 For 2-breaker MBC with mechanical Kirk Key change, the Base MBC, digit #10 & #11 to "00", example: MBC224-35000T-L600 For 2-breaker MBC with electric interlock (with SKRU) change, the Base MBC, digit #10 & #11 to "00" and digit # 15 to "K", example: MBC224-35000T-K600

4. Cabinet conduit access via top, bottom, and sides via knockouts. 5. Warranty is 1 year. Leadtime is 4-8 weeks (typical) via sourced supplier.

Series TLE UPS - 3 Breaker Non-Matching, Free Standing Maintenance Bypass Switchboard (MBS-UL891)

Product Number

Height (in)

Weight (lbs)

Width (in)

Depth (in)

MIB & MBB CB (Trip Rating)

kAIC Rating @ 480VAC

TLE UPS kVA

UIB CB (Trip Rating) 700AT (100%) 700AT (100%) 700AT (100%) 1200AT (100%) 1200AT (100%() 1200AT (100%() 1600AT (100%) 1600AT (100%)

800AT (80%) 800AT (80%) 800AT (80%)

50kAIC 65kAIC 100kAIC 50kAIC 65kAIC 100kAIC 65kAIC 100kAIC

45 45 45 45 45 45 60 60

30 30 30 30 30 30 35 35

90 90 90 90 90 90 90 90

760 760 760 760 760 760

MBS504-80700T-K500 MBS504-80700T-K600 MBS504-80700T-KA00 MBS754-A0A20T-K500 MBS754-A0A20T-K600 MBS754-A0A20T-KA00 MBSA04-A6A60T-K600 MBSA04-A6A60T-KA00

500 500 500 750 750 750

1000AT (100%) 1000AT (100%) 1000AT (100%) 1600AT (100%) 1600AT (100%)

1000 1000

1376 1376

Notes on TLE Non-Matching MBS cabinets: 1. Cabinets are ANSI grey (switchboard) color 2. Baseline configuration is 3-Breaker Type, 480/277V 3ph 4w + gnd. Neutral not used in 3w UPS applications. 3. Circuit Breaker interlock system is Kirk Key electric interlock (w/SKRU) 4. Cabinet conduit access via top and bottom via knockouts. 5. Warranty is 1 year. Leadtime is 4-8 weeks (typical) via GE factory.

Series TLE UPS - 3 Breaker Non-Matching, Wall Mounted Maintenance Bypass Panel (MBP) - Style A

TLE UPS kVA

UIB CB (Trip Rating) 400AT (80%) 400AT (80%) 450AT (80%) 450AT (80%) 700AT (80%) 700AT (80%) 1000AT (80%) 1000AT (80%)

MIB & MBB CB (Trip Rating)

kAIC Rating @ 480VAC

Width (in)

Depth (in)

Height (in)

Weight (lbs)

Product Number

225 225 250 250 400 400 500 500

350AT (80%) 350AT (80%) 400AT (80%) 400AT (80%) 600AT (80%) 600AT (80%) 800AT (80%) 800AT (80%)

35kAIC 35kAIC 35kAIC 35kAIC 35kAIC 35kAIC 50kAIC 50kAIC

40 40 40 40 40 40 40 40

14 14 14 14 14 14 14 14

91 91 91 91 91 91 91 91

557 557 557 557 557 557 557 557

GT20350-10400-A1S GT20350-10400-A2S GT20400-10450-A1S GT20400-10450-A2S GT20600-10700-A1S GT20600-10700-A2S GT20800-11000-A1S GT20800-11000-A2S

Notes on TLE Non-Matching, Wall-mounted Maintenance Bypass Panelboard (MBP) 1. Panelboards are ANSI grey color 2. Baseline configuration is 3-Breaker Type, 480/277V 3ph 4w + gnd. Neutral not used in 3w UPS applications. 3. Circuit Breaker interlock systems are Mechanical Kirk Key (KK) and electric interlock (w/SKRU) 4. Cabinet conduit access via top and bottom via knockouts. 5. Warranty is 1 year. Leadtime is 4-8 weeks (typical) via Source Suppliers

Rev. 1/19 Data subject to change without notice

GE Products BuyLog

go.abb/industrial

20-60

Made with FlippingBook - Online magazine maker