STC - Erection Manual

STC S nap T ight C onstruction

®

ERECTION SEQUENCE

FIELD MODIFY (FIRST RUN ONLY)

STEP 6

LOW SYSTEM

HIGH SYSTEM

CUT AND REMOVE

CUT AND REMOVE

1

BACK-UP PLATE

CUT AND BEND

NOTE All back-up plates on the first panel run will require field modifications to avoid interference with rake support.

BACK-UP PLATE

Slide a back-up plate onto end of panel at splice; make sure the teeth on top of the back-up plate are on top of the panel. Visually check to see that the holes in the panel align with the holes in the back-up plate.

PRE-CUT TRI-BEAD TAPE MASTIC

Place Pre-Cut Tri-Bead tape mastic over the entire width of the panel. It must be centered directly over the pre-punched holes, following the panel configuration.

CAUTION Forcing the tape mastic back into the corners will lessen the thickness of the tape mastic where it is needed most.

RIGHT WAY

WRONG WAY

STC-26

Version 7.1

SUBJECT TO CHANGE WITHOUT NOTICE

Made with FlippingBook - Online catalogs