ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

Legal Disclaimer

The Southern Corridor GRIP was prepared in a profes- sional and workmanlike manner by the TSOs of the nine countries forming the Southern Corridor Region, on the basis of information collected and compiled by them and from stakeholders, and on the basis of the methodology developed by ENTSOG with the support of the stakeholders via public consultation for the preparation of the TYNDP 2013–2022. The Southern Corridor GRIP contains TSOs’ own assumptions and analysis based upon this information. All content is provided “as is” without any warranty of any kind as to the completeness, accuracy, fitness for any particular purpose or any use of results based on this information and the Region’s TSOs hereby ex- pressly disclaim all warranties and representations, whether express or implied, including without limita- tion, warranties or representations of merchantability or fitness for a particular purpose. The reader in its capacity as professional individual or entity shall be responsible for seeking to verify the ac- curate and relevant information needed for its own as- sessment and decision and shall be responsible for use of the document or any part of it for any purpose other than that for which it is intended.

Southern Corridor GRIP 2014–2023 |

101

Made with