ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

The following list contains all projects in the Southern Corridor Region, presented in two tables by country: • one for the projects sponsored by TSOs and • one for the projects sponsored by 3 rd parties. One additional table includes the projects spanning over several countries. The project code is the same as the one the projects had in the TYNDP 2013–2022. In order to ensure consistency the code has not been updated in case a project reached, in the meantime, FID status (this is for instance the case of TAP project or of the reverse flow project at the Greek/Bulgarian border). In such cases a note has been inserted. On the other hand some TSO projects in the Region have been deleted from the list as mentioned below.

2.1. TYNDP 2013–2022 Projects not included in the Southern Corridor GRIP list

The following TSO projects, that make part of the TYNDP 2013–2022, have been excluded from the GRIP list of projects, with the agreement of the sponsoring TSOs, either because they are already completed, either because they do not have Region- al relevance or because they are no longer included in the TSOs’ planning.

Bulgartansgaz projects: TRA-N-145

Black Sea CNG Moreover Bulgartransgaz requested the following projects to be excluded from this GRIP because they are completed or almost completed: TRA-F-143 Reverse flow at the existing IP between BG and GR (Kulata/Sidirokastro) TRA-F-144 Reverse flow at the existing IPs between RO and BG (Negru Voda I, II and III) TRA-F-057 Interconnection Bulgaria – Romania

DESFA projects: POW-F-028 Megalopoli pipeline

FGSZ projects: TRA-N-019

Csepel connecting pipeline

TRA-N-065

Hajduszoboszlo CS

TRA-N-124

Local Odorisation