ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
Plinovodi projects have been grouped in six clusters:
NO.
PROJECT
CODE
STATUS
TSO
TSO PROJECTS 1.1 M2/1 Trojane – Vodice
TRA-F-097 FID
1.2 Compressor Station Kidričevo (3 rd unit 3,5 MW)
TRA-F-096 FID
1.3 CS Kidričevo (2 nd phase – up to 3 units with total power up to 30 MW)
TRA-N-094 non-FID
1.4 CS Vodice II (on M2/1 pipeline up to 3 units with total power up to 30 MW)
TRA-N-102 non-FID
1.5 M1/3 SLO-A border crossing
TRA-N-109 non-FID
2.1 MRS Šempeter – reconstruction
TRA-F-110 FID
2.2 Compressor Station Ajdovščina (3 rd unit)
TRA-N-092 non-FID
2.3 M3 pipeline reconstruction from CS Ajdovščina to Šempeter/Gorizia
TRA-N-108 non-FID
3.1 M6 Ajdovščina – Lucija (section Osp – Koper)
TRA-N-107 non-FID
3.2 R61 Lucija – Sečovlje
TRA-N-114 non-FID
4.1 M3/1a Gorizia/Šempeter – Ajdovščina
TRA-N-099 non-FID PCI 6.7.
4.2 M3/1b Ajdovščina – Kalce
TRA-N-262 non-FID PCI 6.7.
4.3 M3/1c Kalce – Vodice
TRA-N-261 non-FID PCI 6.7.
4.4 Compressor Station Ajdovščina (2 nd phase)
TRA-N-093 non-FID
4.5 M8 Kalce – Jelšane
TRA-N-101 non-FID PCI 6.5.3.
5
R15 /1 Lendava – Kidričevo
TRA-N-112 non-FID PCI 6.23.
6.1 M9a Lendava – Kidričevo
TRA-N-098 non-FID
(including CS Kidričevo 3 rd phase with up to 5 units of total power up to 80 MW)
TRA-N-263 non-FID
6.2 M9b Kidričevo – Vodice
(including CS Vodice I – 4 units with total power up to 60 MW)
6.3 M10 Vodice – Rateče
TRA-N-100 non-FID