ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

4 SUPPLY

45 4.1. National Production . . . . . . . . . . . . . . . . . 46 4.2 Imports . . . . . . . . . . . . . . . . . . . . . . 47 4.3 Prices . . . . . . . . . . . . . . . . . . . . . . . 50

5 ASSESSMENTS AND MARKET ANALYSIS

54 5.1 Interconnection Point capacities offered (technical capacity), booked and used . . . . . . . . . . . . . . . . . 55 5.2 Conclusions on the existence of congestion of the Region’s Interconnecting Points . . . . . . . . . . . . . . . 71

6 THE ROLE OF THE SOUTHERN CORRIDOR REGION 72 6.1 Key transmission projects of the Region . . . . . . . . . . 73 6.2 Other large projects . . . . . . . . . . . . . . . . . 75 6.3 Other projects of the Region . . . . . . . . . . . . . . 77

7 NETWORK ASSESSMENTS

80 7.1 Introduction . . . . . . . . . . . . . . . . . . . . 81 7.2 Scenarios . . . . . . . . . . . . . . . . . . . . . 82 7.3 Simulation results . . . . . . . . . . . . . . . . . . 84

8 CONCLUSIONS

98

LEGAL DISCLAIMER

101

DEFINITIONS, ABBREVIATIONS, COUNTRY CODES 102

Image courtesy of DESFA

Southern Corridor GRIP 2014–2023 |

3

Made with