ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report

A. CROSS-BORDER IPS WITHIN EU

Oberkappel (BOG > GRT gaz Deutschland and Open Grid Europe) Bidirectional

400 500 450 GWh/d

400 500 450 GWh/d

IP Oberkappel (AT > DE)

IP Oberkappel (AT > DE)

350 300 250 150 100 50 200

350 300 250 150 100 50 200

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Technical Capacity

Flow

Average daily

Flow Range

Booked non interruptible + interruptible Capacity

Technical Capacity

Figure 4.1.1: Oberkappel: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.1.2: Oberkappel: Flows and booked capacity vs. technical capacity (daily)

Oberkappel (GRT gaz Deutschland and Open Grid Europe > BOG) Bidirectional

400 450 GWh/d

400 450 GWh/d

IP Oberkappel (DE > AT)

IP Oberkappel (DE > AT)

350 300 250 150 100 50 200

350 300 250 150 100 50 200

0

0

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Oct 2011

Dec 2011

Feb 2012

Apr 2012

Jun 2012

Aug 2012

Oct 2012

Dec 2012

Feb 2013

Apr 2013

Jun 2013

Aug 2013

Technical Capacity

Average daily

Flow Range

Booked non interruptible + interruptible Capacity Booked non interruptible Capacity

Flow

Booked non interruptible + interruptible Capacity

Technical Capacity

Figure 4.2.1: Oberkappel: Flows and booked capacity vs. technical capacity (monthly)

Figure 4.2.2: Oberkappel: Flows and booked capacity vs. technical capacity (daily)

56 |

Southern Corridor GRIP 2014–2023

Made with