ENTSOG Southern Corridor (SC) Gas Regional Investment Plan (GRIP) 2014-2023 / Main Report
A. CROSS-BORDER IPS WITHIN EU
Oberkappel (BOG > GRT gaz Deutschland and Open Grid Europe) Bidirectional
400 500 450 GWh/d
400 500 450 GWh/d
IP Oberkappel (AT > DE)
IP Oberkappel (AT > DE)
350 300 250 150 100 50 200
350 300 250 150 100 50 200
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Technical Capacity
Flow
Average daily
Flow Range
Booked non interruptible + interruptible Capacity
Technical Capacity
Figure 4.1.1: Oberkappel: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.1.2: Oberkappel: Flows and booked capacity vs. technical capacity (daily)
Oberkappel (GRT gaz Deutschland and Open Grid Europe > BOG) Bidirectional
400 450 GWh/d
400 450 GWh/d
IP Oberkappel (DE > AT)
IP Oberkappel (DE > AT)
350 300 250 150 100 50 200
350 300 250 150 100 50 200
0
0
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Oct 2011
Dec 2011
Feb 2012
Apr 2012
Jun 2012
Aug 2012
Oct 2012
Dec 2012
Feb 2013
Apr 2013
Jun 2013
Aug 2013
Technical Capacity
Average daily
Flow Range
Booked non interruptible + interruptible Capacity Booked non interruptible Capacity
Flow
Booked non interruptible + interruptible Capacity
Technical Capacity
Figure 4.2.1: Oberkappel: Flows and booked capacity vs. technical capacity (monthly)
Figure 4.2.2: Oberkappel: Flows and booked capacity vs. technical capacity (daily)
56 |
Southern Corridor GRIP 2014–2023
Made with FlippingBook